Search results

Filter by

Remove filters

804 results found

Managed Woodland Headline Performance Indicator England 30 June 2016

This data is the source dataset for the Forestry Commissions Headline Performance Indicator: 'Percentage of woodland in active management (including the Public Forest Estate)'. This Indicator...

Agriculture in the United Kingdom

This annual publication provides an overview of agriculture in the UK, fulfilling the requirement that Ministers publish an annual report on matters relating to price support for agricultural...

Exceptions to Cross-Government moratoria on spend in Defra

This dataset is a list of those items of spend that have been allowed in Defra since the announcement (24 May 2010) of five cross-government moratoria: ICT spend above £1m; Advertising &...

Species point records from 1993 MNCR Brancaster to Blakeney (Norfolk) littoral survey

Littoral survey along the north Norfolk coast from Blakeney to Brancaster using normal MNCR methods. All parts of the barrier beach system were covered from the seaward facing sandy shores to the...

Habitat point records from 1993 MNCR Brancaster to Blakeney (Norfolk) littoral survey

Littoral survey along the north Norfolk coast from Blakeney to Brancaster using normal MNCR methods. All parts of the barrier beach system were covered from the seaward facing sandy shores to the...

Broadscale habitat (EUNIS level 3) for East of Haig Fras recommended Marine Conservation Zone (rMCZ)

Updated habitat map resulting from an integrated analysis of the 2012 (CEND 3/12a) and 2013 (CEND 5/13) dedicated survey data for East of Haig Fras recommended Marine Conservation Zone (rMCZ). It...

Species point records from 1987 Loughborough University Poll Loisgann & Cull Lochain survey

Brief description of these 2 lochans and their marine life by snorkelling. Recommends the area as rich and diverse and that current salmon farming applications should be opposed, and...

Habitat point records from 1987 Loughborough University Poll Loisgann & Cull Lochain survey

Brief description of these 2 lochans and their marine life by snorkelling. Recommends the area as rich and diverse and that current salmon farming applications should be opposed, and...

Extensive vegetation and soil surveys from multiple sites in boreal forests of subarctic Canada, 2013-2014

The dataset contains a stratified survey of ecological and soil states at sites where fine scale patterns of covariation between vegetation and edaphic characteristics were recorded. Key data...

2012-2013, Gardline and Titan, Walney Extension Offshore Wind Farm, Geophysical Cable Route Survey

Gardline Geosurvey Limited was contracted to survey the proposed Walney Extension Offshore Wind Farm Cable Route Survey, between 14-Dec-2012 and 28-Dec-2012. The geophysical data acquisition...

2012, Fugro Engineering Services, Burbo Bank Extension Offshore Wind Farm, Geotechnical Site Investigation

A ground investigation has been carried out by Fugro Seacore Limited (FSCL) on the instructions of DONG Energy Burbo Bank Extension (UK) Limited (the Client) and under the supervision of Ramboll...

2012, 6 Alpha, Walney Extension Offshore Wind Farm, UXO Assessment and Risk Mitigation Strategy

DONG Energy has commissioned 6 Alpha Associates Limited (“6 Alpha”) to conduct a detailed desk based Unexploded Ordnance (UXO) threat and risk assessment study for the Walney Extension Offshore...

2014, Titan, Walney Extension Offshore Wind Farm, Additional Export Cable Route Infill Survey

In June 2014, Titan Environmental Surveys were commissioned by Dong Energy to conduct a geophysical and bathymetric survey for an area of Export Cable Route not previously surveyed. The objectives...

2015, Cathie Associates, Burbo Bank Extension Offshore Wind Farm, Cable Burial Risk Assessment

Cathie Associates have been commissioned by DONG Energy to perform a Burial Risk Assessment (BRA) for the inter-array cables and the export cable. The purpose of the BRA is to determine the minimum...

2012, Maritime Archaeology Ltd., Burbo Bank Extension Offshore Wind Farm, Archaeological Impact Assessment

The aim of this pre-development analysis is to provide DONG Energy with an assessment of any features observed within the survey area that might be considered to be archaeologically significant.

2014, Fugro Engineering Services, Burbo Bank Extension Offshore Wind Farm, Geotechnical Site Investigation

A ground investigation has been carried out by Fugro Seacore Limited (FSCL) on the instructions of DONG Energy Burbo Bank Extension (UK) Limited (the Client) and under the supervision of Cathie...

2013, VSH, Walney Extension Offshore Wind Farm, Export Cable Landfall HDD Technical Assessment

Visser & Smit Hanab (VSH) have been appointed by DONG energy (DE) to provide a high level assessment of the export cable landfall(s) associated with the extension to the existing...

2014, Nexen Petroleum UK Ltd, Manhattan Extension, Site Survey, DECC Reference Number GS_225

An oil and gas industry semi-sub rig, debris clearance, environmental site survey acquired in October 2014. The block numbers traversed were 15/22, 15/23.

Cycling - strategic routes

Key named cycling routes radiating out from the centre of Bristol that are mostly marked en route by sign posts with the colour-coded route name shown in a consistent manner, allowing easier...

DSIT: spend control data

This dataset is also known as Exceptions to cross-government moratoria on spend or exceptions to spending controls. Files previously released list items of spend that have been allowed via the...