Search results

Filter by

Remove filters

804 results found

Exceptions to spending moratoria applied for by the Serious Fraud Office

Five key areas of spend have been affected with freezes on: -All new ICT spend above £5 million or over £1 million for systems that support administration including finance, HR or procurement...

Exceptions to cross-government moratoria on spend in BIS

Lists items of spend that have been allowed in BIS since the announcement (24 May 2010) of five cross-government moratoria: ICT spend above £1m; Advertising and marketing; consultancy; Property...

Skype for Business Conferencing Usage

**A data set showing the use of Skype for Business for conferencing at Leeds City Council.** **Total AV conferences** \- This shows the number of separate AV conferences which have actually...

Hospices

Hospices in England, Wales, Isle of Man and the Channel Islands Contains: Two organisation types, NHS Trust and Non-NHS Organisation, are able to have a classification or ‘Subtype’ added to...

2013, DONG Energy, Walney Extension Offshore Wind Farm, Local Impact Report

On the 28th June 2013, DONG Energy submitted an application for a Development Consent Order (DCO) to the Planning Inspectorate (PINS) to build and operate an extension to the Walney Offshore Wind...

2013, ESG, Burbo Bank Extension Offshore Wind Farm, Intertidal Geophysical Survey

In October 2013 Environmental Scientifics Group (ESG) were commissioned by Dong Energy UK (DONG) to conduct an intertidal geophysical survey over an area of foreshore at Rhyl in Denbighshire. The...

2014, Anatec Limited, Walney Extension Offshore Wind Farm, Shipping and Fishing Review

Anatec have been commissioned by Cathie Associates to analyse the shipping and fishing activity in the area surrounding the Walney Extension Offshore Wind Farm and its export cable system, located...

2013, DONG Energy, Walney Extension Offshore Wind Farm, Habitats Regulations Assessment

This Habitats Regulations Assessment addresses the requirement contained in regulation 5(2)(g) of the Infrastructure Planning Regulations 2009, which requires an applicant for development consent...

2015, Spectrum Geosurvey Limited, Kentish Flats Extension, Post Construction Survey 2015

Spectrum Geosurvey Limited was contracted by Vattenfall Wind Power Limited to perform a post construction survey on the Kentish Flats Extension offshore wind farm. The primary requirement was to...

2019, Ocean Ecology, Burbo Bank Extension, Post construction Benthic Ecology Survey

This report presents the findings of the second Burbo Bank Extension (BBW02) post-construction benthic survey undertaken by Ocean Ecology Limited (OEL) on behalf of Ørsted. The benthic survey was...

2013-2014, Fugro, Walney Extension Offshore Wind Farm, Geotechnical Site Investigation

Cathie Associates were contracted by DONG as Clients Representative for a geotechnical survey for the Walney Wind Farm Extension project. The survey works initially consisted of utilising 3no....

2012, Osiris Projects, Humber Gateway Offshore Wind Farm, UXO Extension Survey

Osiris Projects were commissioned in December 2011 by EON to carry out an extension to the UXO survey at the proposed Humber Gateway windfarm, which was completed in June 2011. The site initially...

2016-2018, Fugro EMU Ltd., Burbo Bank Extension, Wave and Current Data

Two SEAWATCH Midi185 buoys has been positioned just outside of the Burbo Extension Offshore Wind Farm boundary. One is located at the North of the park (53°30.113’ N, 003°21.687’ E) and...

2004, EON, Johnston Field Extension, Site Survey, BGS Reference Number EU04SS0001

An oil and gas industry site survey acquired in August 2004 to identify any seabed obstructions and/or sub-surface hazards at the proposed 43/27a-H location that may impede the emplacement and...

BIS research paper no.48

Spreadsheet of data accompanying documents entitled: 'Reporting on employment and earnings using experimental matched data' [URN 11/1037], 'Annex 1: Individualised learner record / labour force...

Effects of thinning and extraction on advance regeneration (Wykeham 2007)

Extensive damage to and mortality of understorey seedlings during overstorey thinning could prevent the use of natural regeneration as a method of restocking. Experiments carried out on three...

Pupil attainment at GCE/VCE A/AS: results

Average GCE/VCE A/AS and key skills point scores, Advanced Extension Awards (AEA) and post-16 vocational qualification achievement of 16-18 year old candidates by gender in each Local Education...

Managed Woodland Headline Performance Indicator England 30 June 2013

This data is the source dataset for the Forestry Commissions Headline Performance Indicator: 'Percentage of woodland in active management (including the Public Forest Estate)'. This Indicator...

Managed Woodland Headline Performance Indicator England 31 December 2013

This data is the source dataset for the Forestry Commissions Headline Performance Indicator: 'Percentage of woodland in active management (including the Public Forest Estate)'. This Indicator...

Managed Woodland Headline Performance Indicator England 31 December 2012

This data is the source dataset for the Forestry Commissions Headline Performance Indicator: 'Percentage of woodland in active management (including the Public Forest Estate)'. This Indicator...