Search results

Filter by

Remove filters

764 results found

Big Tree Plant Scheme Locations England 2013/2014

This dataset has ben superseded by the following dataset, which contains all years and accuracy of site location has been improved: https://data.gov.uk/dataset/big-tree-plant-sites This data shows...

Big Tree Plant Scheme Locations England 2014/2015

This dataset has ben superseded by the following dataset, which contains all years and accuracy of site location has been improved: https://data.gov.uk/dataset/big-tree-plant-sites This data shows...

Big Tree Plant Scheme Locations England 2012/2013

This dataset has ben superseded by the following dataset, which contains all years and accuracy of site location has been improved: https://data.gov.uk/dataset/big-tree-plant-sites This data shows...

NI 050 Emotional health of children

Percentage of children whose emotional health is good and will be based on responses to individual questions, drawn from the TellUs Survey. Source: TellUs3 Survey: DCSF Publisher: Department for...

Public Data Group Survey

Results from a Public Data Group survey of user of datasets produced by its members. The Public Data Group consists of 4 agencies - Met Office, HM Land Registry, Companies House and Ordnance Survey...

Modern workplaces consultation: government response on flexible working. Impact assessment

Data supporting the impact assessment for proposals to extend the right to request flexible working to all employees. These proposals aim to facilitate the employee-employer information exchange...

Big Tree Plant Sites

The Big Tree Plant was a national campaign that brought together a partnership of national organisations who already plant trees, as well as civic and community groups working with Defra and the...

Adjustments for Measured Term Contracts

The monthly Updating Percentages may be used as a contractual basis for the reimbursement of increased costs on measured term contracts let on all PSA Schedules of Rates or other forms of...

Species point records from 1991 ICI north-east England sublittoral sediment survey

The Tees Estuary (north-east England) has been industrialised since the ninteenth century and used for the disposal of industrial and domestic waste. Its physical nature has been changed by...

Habitat point records from 1991 ICI north-east England sublittoral sediment survey

The Tees Estuary (north-east England) has been industrialised since the ninteenth century and used for the disposal of industrial and domestic waste. Its physical nature has been changed by...

Modern workplaces [consultation]: government response on flexible parental leave. Impact assessment.

Data supporting the impact assessment for proposals on extending flexible parental leave in the closed consultation on modern workplaces (URN 11/699). The new system of flexible parental leave aims...

Influence of riparian shade on stream thermal regime (New Forest 2010)

River temperature is a key parameter of water quality. Most bio-chemical processes and physical characteristics of a water body are functions of temperature. Aquatic organisms including fish are...

NI 180 The number of changes of circumstances which affect customers HB/CTB benefit entitlement within the year.

The number of changes to customers HB/CTB benefit entitlement that are processed by the local authority in a year. Source: Department for Work and Pensions (DWP) Publisher: DCLG Floor Targets...

NI 191 - Residual household waste per head

Indicator measuring the number of kilograms of household waste collected that is not sent for reuse, recycling or is not composted or anaerobic digestion per head of the population. This includes...

Species point records from 1985 University of Bristol upper Severn Estuary survey

This study was commissioned to extend the sparse information on the ecology of the Upper Severn Estuary in relation to the feasibility study to place a tidal energy barrage at English Stones. The...

Habitat point records from 1985 University of Bristol upper Severn Estuary survey

This study was commissioned to extend the sparse information on the ecology of the Upper Severn Estuary in relation to the feasibility study to place a tidal energy barrage at English Stones. The...

Various water quality parameters covering a pre and post-planting regime (Halladale study 1995-2010)

Our study was driven by concerns that afforesting the headwaters of the Upper Halladale River in North Scotland would affect water quality and the local salmon fishery. The main issue was the...

Social Action Fund grant recipients 2011-2013

The Social Action Fund has been created to support the Government’s vision for a Big Society by funding proposals that will embed long term increases in giving either: •time - volunteering,...

Rents: Average weekly RSL rents

The Regulatory and Statistical Return (RSR) is a data collection carried out by the Tenant Services Authority (TSA) and is completed by Registered Social Landlords (RSLs) and based on general needs...

NI 003 - Civic participation in the local area

The indicator aims to measure a sense of belonging to ones neighbourhood and in doing so enables a thriving place in which a fear of difference is replaced by a shared set of values and a shared...