Data links
Link to the data | Format | File added | Data preview |
---|---|---|---|
Download A link to the general host site. , Format: N/A, Dataset: 2012, DONG Energy, Gunfleet Sands 3 - Demonstration Project, Decommissioning Plan | N/A | 10 July 2024 | Not available |
Download A link to the web service or dataset. , Format: N/A, Dataset: 2012, DONG Energy, Gunfleet Sands 3 - Demonstration Project, Decommissioning Plan | N/A | 10 July 2024 | Not available |
Additional information
View additional metadata
- Added to data.gov.uk
- 2014-02-12
- Access contraints
- No limitations on public access.
- Harvest GUID
- 9c91b29f784720014f876b412385ad32
- Extent
- Latitude: 51.8824° to 51.4462°
- Longitude: 0.8996° to 1.6412°
- Spatial reference system
- urn:ogc:def:crs:EPSG::4326
- Dataset reference date
- 2012-07-02 (publication)
- Frequency of update
- notPlanned
- Responsible party
- DONG Energy Power (UK) Ltd (originator, custodian)
- ISO 19139 resource type
- series
- Metadata language
- eng
- Source Metadata
- XML
- HTML
Contact
Licence information
Available for use providing the originators are acknowledged in any publications produced.