Search results

Filter by

Remove filters

25 results found

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Update, 06.03.14

This is a blog (Update, 06.03.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Workshop1, 30.04.14

This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project blog: Mixed Matrix Membrane Preparation for PCC, Update, 22.01.14

This is a blog (Update, 22.01.14) on the UKCCSRC Call 1 project, Mixed Matrix Membrane Preparation for PCC. Grant number: UKCCSRC-C1-36.

UKCCSRC Call 1 project blog: Oxyfuel and EGR Processes in GT Combustion, Update, 01.11.13

This is a blog (Update, 01.11.13) on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project blog: Oxyfuel and EGR Processes in GT Combustion, Final, 01.08.14

This is a blog (Final, 01.08.14) on the UKCCSRC Call 1 project, Oxyfuel and EGR Processes in GT Combustion. Grant number: UKCCSRC-C1-26.

UKCCSRC Call 1 project blog: Multi-Phase Flow Modelling for Hazardous Assessment, Final, 18.11.14

This is a blog (Final, 18.11.14) on the UKCCSRC (UK Carbon Capture and Storage Research Centre) Call 1 project, Multi-Phase Flow Modelling for Hazardous Assessment. Grant number: UKCCSRC-C1-07.

UKCCSRC Call 1 project blog: Tractable Equation of State for CO2 Mixtures, Update, 27.08.14

This is a blog (Update, 27.08.14) on the UKCCSRC Call 1 project, Tractable Equation of State for CO2 Mixtures. Grant number: UKCCSRC-C1-22.

UKCCSRC Call 2 project blog: Quantifying Residual and Dissolution Trapping in the CO2CRC Otway Injection Site, Update, 20.01.15

This is a blog (Update, 20.01.15) on the UKCCSRC Call 2 project, Quantifying Residual and Dissolution Trapping in the CO2CRC Otway Injection Site. Grant number: UKCCSRC-C2-204.

City Intelligence Data Design Guidelines

A set of guidelines to help us all at the GLA understand the basic principles of data visualisation, provide some examples of good practice, working processes and links to tools we can all use. See...

Business rates

Information on all business who pay business rates in Leeds. Information includes business name, rateable value and full postal address. For a visualisation of the information contained in this...

Social media usage by local government

A list of UK local authorities which are using social media such as Facebook, Twitter, YouTube. Also includes those with RSS feeds, web development blogs and open data.

Public Toilets

The London Assembly Health and Public Services Committee has published a report into the availability of information about public toilets in London. This package provides supporting information...

London Office of Data Analytics

The GLA and Nesta are working together to run a pilot to demonstrate that performing data analytics on datasets sourced from multiple local authorities and public sector bodies can help reform...

2021 census first release

On 28 June 2022 ONS released the first results from the 2011 Census of England and Wales comprising for each local authority the estimated population at census day (21 March 2021) and the number of...

London's sectors - More Detailed Jobs

More Detailed Jobs This dataset provides estimates of employee jobs in London down to 4-digit Standard Industry Classification level, from 1998 to 2022. The latest release was in July 2024 - see...

Council Current Spending

Due to the unprecedented circumstances we are facing during the Coronavirus (COVID-19) pandemic, it may not be possible for us to meet the timescales stipulated with regard to Council Spend Data...

Workforce Profile

This provides a summary of the characteristics of the Council workforce and is based on data from the Annual Equality Duty Report. It represents all of the People working for the Council as...

Trend-based population projections

*Update 6 August - draft 2024-based projections are now available. Final versions of these projections are expected to be published early in 2026. More information about these can be found in this...

ENV_TREE_PRESERVATION_ORDERS

A Tree Preservation Order (TPO) is an Order made by a local planning authority to protect specific trees, groups of trees or woodlands in the interests of amenity. Anyone who contravenes an Order...

London Building Stock Model 2 (LBSM 2)

The London Building Stock Model v2 provides energy efficiency data for all London homes. This includes information on EPC ratings, heating systems, insulation levels and building fabric. This...