Filter by
2,158
results found
- Published by:
- High Speed 2 Limited
- Last updated:
- 20 December 2021
GIS shapefile data presenting the July 2013 consultation alignments, stations and depots for the proposed HS2 Phase Two proposed line of route between the West Midlands and the East Midlands,...
- Published by:
- Ordnance Survey
- Last updated:
- 02 October 2023
From Parliamentary constituencies to council wards, Boundary-Line™ maps every administrative boundary in detail for you. And what's more, it's completely free to download and use.
Bring statistics...
- Published by:
- Ordnance Survey
- Last updated:
- 16 April 2025
From Parliamentary constituencies to council wards, Boundary-Line™ maps every administrative boundary in detail for you. And what's more, it's completely free to download and use.
Bring statistics...
- Published by:
- Environment Agency
- Last updated:
- 07 April 2026
The Main River Consultation Area defines the easement associated with the Statutory Main River Map enabling Local Planning Authorities to check when statutory consultation with the Environment...
- Published by:
- South Norfolk District Council
- Last updated:
- 22 February 2014
Shows the extents of a consultation zone designed to trigger appropriate consultations for development over a specific size. Within a 1.5km radius of the airfield – every application for...
- Published by:
- NHS Digital
- Last updated:
- 19 October 2017
Dental Consultants in England
Contains:
Name and identifying codes for Dental Consultants employed by NHS Trusts in England. The codes are derived from the Practitioner’s General Dental Council...
- Published by:
- City of York Council
- Last updated:
- 09 September 2025
Privacy notices used in recent City of York Council consultations.
For past consultation privacy notices please see the [__archived__ consultation privacy notices...
- Published by:
- NHS Digital
- Last updated:
- 19 October 2017
Hospital Consultants in England
Contains:
Name and identifying codes for Hospital Consultants employed by NHS Trusts in England. The codes are derived from the Practitioner’s General Medical...
- Published by:
- Devon County Council
- Last updated:
- 10 February 2016
Devon Minerals Local Plan 2004 sets out Minerals Consultation Areas. These generally cover mineral development sites such as quarries and mineral transportation / processing infrastructure. Any...
- Published by:
- Ordnance Survey
- Last updated:
- 10 January 2025
A feature which has a line geometry and represents a wall between two buildings, building internal divisions, or an overhanging building edge.
- Published by:
- Ordnance Survey
- Last updated:
- 10 January 2025
A line feature representing the edges of a traffic calming area in the road network. (This abstract has been temporarily padded to import into GeoNetwork)
- Published by:
- City of York Council
- Last updated:
- 26 August 2025
Privacy notices used in __past__ City of York Council consultations.
For live consultation privacy notices please see the [consultation privacy notices...
- Published by:
- London Borough of Lambeth
- Last updated:
- 07 August 2019
showing
areas that TFL consultation is required on planning applications due to tube
tunnels running beneath the site.
- Published by:
- Ordnance Survey
- Last updated:
- 10 January 2025
Feature which has a line geometry and represents a linear, freestanding, manmade construction that is not a building and is not wide enough to capture as a structure. Examples include a gate or...
- Published by:
- Cheshire East Council
- Last updated:
- 21 February 2019
Mineral consultation areas
- Published by:
- Department for Business, Innovation and Skills
- Last updated:
- 19 May 2022
BIS-led consultations
- Published by:
- City of York Council
- Last updated:
- 26 August 2025
Performance Indicators : Consultation
- Published by:
- London Borough of Barnet
- Last updated:
- 02 July 2025
Engage Barnet is the consultation hub for the London Borough of Barnet. This site will help you find and participate in consultations that interest you, as well as examine the data resulting from...
- Published by:
- Ordnance Survey
- Last updated:
- 20 December 2024
Feature which has a line geometry and represents the alignment of either the higher limit, or the side or lower limit of areas with a distinct physical morphology, typically where there is a...
- Published by:
- Department for International Development
- Last updated:
- 12 December 2013
Performance Management Feedback system for line managers only.