Search directory

Filter by

35,059 results found

Saved Local Plan Policy D9 - Internationally important sites

Dataset showing Internationally important sites under Policy D9 of the Saved Local Plan 2006. Areas recorded as polygons. Upon accessing this Licensed Data you will be deemed to have accepted the...

% of infants who received a 6-8 week review by the time they were 8 weeks

% of infants who received a 6-8 week review by the time they were 8 weeks

Q 8

PDF map of quadrant 8

Q 8

PDF map of quadrant 8

ShapeCalc - 2D-3D shape projection tool and underlying database of 2D width/length distributions

ShapeCalc is an Excel-based tool that uses 2D crystal intersection widths and lengths to estimate 3D crystal shape. ShapeCalc provides 3D (S:I:L) shape estimates for 2D width-length (w-l) input...

Survey : CORY 8/97 (part of English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D))

This survey was undertaken by Cefas as part of the English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D); Station, catch, length (all species) and biological data (selected...

Survey : CORY 8/95 (part of English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D))

This survey was undertaken by Cefas as part of the English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D); Station, catch, length (all species) and biological data (selected...

Survey : CORY 8/98 (part of English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D))

This survey was undertaken by Cefas as part of the English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D); Station, catch, length (all species) and biological data (selected...

Survey : CORY 8/93 (part of English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D))

This survey was undertaken by Cefas as part of the English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D); Station, catch, length (all species) and biological data (selected...

Survey : CORY 8/91 (part of English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D))

This survey was undertaken by Cefas as part of the English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D); Station, catch, length (all species) and biological data (selected...

Survey : CORY 8/99 (part of English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D))

This survey was undertaken by Cefas as part of the English Channel Beam Trawl Survey (VIId and IVc), Qtr 3 (FSS: BTS7D); Station, catch, length (all species) and biological data (selected...

Saved Local Plan Policy C8 - Dalton Town Centre

Dataset showing Dalton Town Centre under Policy C8 of the Saved Local Plan 2006. Areas are recorded as a polygon. Upon accessing this Licensed Data you will be deemed to have accepted the terms of...

CS Core Policy 8

Area subject to Core Policy 8 in the Core Strategy Development Plan Document (CS DPD)

CS Policy SP8

Area subject to Spatial Policy 8 in the Core Strategy Development Plan Document (CS DPD)

% of other applications determined within 8 Weeks (NPI157c)

% of other applications determined within 8 Weeks (NPI157c) *This indicator has been discontinued

People who have a follow-up assessment between 4 and 8 months after initial admission for stroke (CCGOIS 3.8)

The percentage of people who have a follow-up assessment between 4 and 8 months after initial admission for stroke. Current version updated: Sep-17 Next version due: Sep-18

Romford Car parking zone - 8

Romford Car parking zone - 8

MoD Map Layers

MoD provided map layers for use by MoD and other RIMNET Users

CS Policy SP8 Sites

Sites identified subject to Spatial Policy 8 in the Core Strategy Development Plan Document (CS DPD)

2001, ATP Oil & Gas UK Ltd, UKCS 47/10 Helvellyn, Rough, A2D, Pipeline/Cable Route Survey, BGS Reference Number AO01SS0002

An oil and gas industry site survey for a pipeline/cable route (Helvellyn to Rough, Helvellyn to A2D) acquired between November and December 2001. The block numbers traversed were 47/10, 47/13,...