2014, Fugro EMU, Dudgeon Offshore Wind Farm, Pre-construction Baseline Ecology Study

DOW is located 32 km off the North Norfolk coast, in water depths of between 18 m and 25 m. The site will have a capacity of 402 MW (Mega Watts) and comprise of 67 wind turbine generators....

2016, Fugro Emu Limited, Walney Offshore Wind Farm, Post Construction Survey 1

Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to undertake two separate bathymetric surveys (survey 1 and survey 2) in the East Irish Sea, which were...

2015, EGS, Lincs Offshore Wind Farm, Post Construction Hydrographic, Geophysical and Benthic Survey

EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2015 post construction (Year 3) hydrographic and geophysical surveys of the Lincs and L and...

2008, RPS, Gunfleet Sands Offshore Wind Farm, Pre-construction Benthic Ecology Study

This project contains the results of benthic surveys at the Gunfleet Sands I and II offshore windfarm sites. The surveys were carried out by RPS hydrosearch on behalf of DONG Energy. Results...

2012, Osiris Projects, Robin Rigg Offshore Wind Farm, Post Construction Geophysical Survey

Osiris Projects were commissioned in January 2012 by E.ON Climate and Renewables to carry out bathymetric and side scan sonar surveys at the Robin Rigg offshore wind farm. The survey was completed...

Winter 2013, Osiris Projects, Lincs Offshore Wind Farm, Post-Construction Geophysical Survey

Osiris Projects were commissioned in April 2013 by Centrica Renewable Energy Ltd. (CREL) and Renewable Energy Systems Ltd. (RES) to carry out post-construction surveys on the LINCS Offshore Wind...

2010, RPS Energy, Ormonde Offshore Wind Farm, Construction (Year 1) Environmental Monitoring

In February 2007, Ormonde Energy Limited (OEL), a wholly owned subsidiary of Vattenfall UK plc, was granted consent from the Secretary of State to develop the Ormonde offshore wind farm project...

2007, Galloway Fisheries Trust, Robin Rigg, Construction year baseline survey of migratory fish

Construction year baseline survey of migratory fish 2007. A report by Galloway Fisheries Trust on migratory fish during the construction phase. Includes Atlantic salmon, Sea trout, Allis shad,...

2013, CMACS, Ormonde Offshore Wind Farm, Year 1 Post-Construction Benthic Monitoring

Centre for Marine and Coastal Studies Ltd (CMACS) was appointed by RPS Energy on behalf of Vattenfall UK to undertake post-construction benthic environmental monitoring surveys for the Ormonde...

2002, PMSS, Gunfleet Sands Offshore Wind Farm, HV Cable Landing Construction Techniques

This project covers the route research, analysis and conclusions in respect of land side HV cable installation for the Gunfleet Sands Offshore Wind Farm. The sea landing point has been carefully...

2011, Entec UK Limited, Teesside Offshore Wind Farm, Pre-Construction FEPA Monitoring

This report was produced to provide a summary of the results of the pre-construction baseline monitoring for the Teesside Offshore Wind Farm. This monitoring was required as part of the conditions...

2014, EGS, Lincs Offshore Wind Farm, Post Construction Hydrographic, Geophysical and Benthic Survey

EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2014 post construction hydrographic and geophysical surveys of the Lincs windfarm and...

2002, North Hoyle Offshore Wind Farm, Pre-Construction Survey, DGN CAD Files

This series contains DGN CAD files.

2008, Osiris Projects, Robin Rigg Offshore Wind Farm, Mid-construction Geophysical Survey

On the instructions of E.ON Climate & Renewables UK, Osiris Projects were commissioned to undertake a pre-construction geophysical and scour monitoring survey covering the proposed Robin Rigg...

2011, RPS/Titan, Gunfleet Sands 3, Pre-Construction Sub-tidal Benthic Monitoring

RPS Planning and Development were commissioned by DONG Energy Power (UK) Ltd. to undertake an assessment of the subtidal benthic ecology in the vicinity of the proposed Gunfleet Sands 3 (GFS 3)...

2010, Osiris Projects, Robin Rigg Offshore Wind Farm, Post Construction Geophysical Survey

On the instructions of E.ON UK Solway Offshore Ltd and E.ON UK Offshore Energy Resources Ltd, Osiris Projects were commissioned to undertake a post-construction geophysical survey covering the...

2005, RSKENSR Group, Barrow Offshore Wind Farm, Pre-construction Baseline Environmental Monitoring

This project examines the onshore and offshore elements of the environmental pre-construction monitoring undertaken at the site of the Barrow offshore wind farm to comply with the conditions of the...

2014, EGS, Walney Offshore Wind Farms, September September Post-Construction Geophysical Survey

In September 2014 EGS (International) Ltd was contracted to undertake the post construction (6 month) survey of the Barrow and Walney OWFs and export cables.

2013, EGS Ltd, Lynn and Inner Dowsing Offshore Wind Farms, Post-Construction Survey

EGS (International) Ltd was contracted to undertake the 2013 Post-Construction hydrographic and geophyscial survey (Multibeam and side scan sonar systems) of the Lynn and Inner Dowsing (L&ID)...

Permanent dwellings started, England, District By Tenure - Rolling 4 quarter total

This data set contains rolling four quarter totals (England only) on house building starts. From 2011/12 imputed data is included. Imputed data should not be seen as an estimate for the individual...