Filter by
Remove filters
877
results found
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
DOW is located 32 km off the North Norfolk coast, in water depths of between 18 m and 25 m. The
site will have a capacity of 402 MW (Mega Watts) and comprise of 67 wind turbine generators....
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
Fugro EMU Limited (Fugro EMU) was contracted by DONG Energy (hereafter known as the client) to undertake two separate bathymetric surveys (survey 1 and survey 2) in the East Irish Sea, which were...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to
undertake the 2015 post construction (Year 3) hydrographic and geophysical surveys of the
Lincs and L and...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
This project contains the results of benthic surveys at the Gunfleet Sands I and II offshore windfarm sites. The surveys were carried out by RPS hydrosearch on behalf of DONG Energy. Results...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
Osiris Projects were commissioned in January 2012 by E.ON Climate and Renewables
to carry out bathymetric and side scan sonar surveys at the Robin Rigg offshore wind
farm. The survey was completed...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
Osiris Projects were commissioned in April 2013 by Centrica Renewable Energy Ltd.
(CREL) and Renewable Energy Systems Ltd. (RES) to carry out post-construction
surveys on the LINCS Offshore Wind...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
In February 2007, Ormonde Energy Limited (OEL), a wholly owned subsidiary of Vattenfall UK plc, was granted consent from the Secretary of State to develop the Ormonde offshore wind farm project...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
Construction year baseline survey of migratory fish 2007. A report by Galloway Fisheries Trust on migratory fish during the construction phase. Includes Atlantic salmon, Sea trout, Allis shad,...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
Centre for Marine and Coastal Studies Ltd (CMACS) was appointed by RPS Energy on behalf of Vattenfall UK to undertake post-construction benthic environmental monitoring surveys for the Ormonde...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
This project covers the route research, analysis and conclusions in respect of land side HV cable installation for the Gunfleet Sands Offshore Wind Farm. The sea landing point has been carefully...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
This report was produced to provide a summary of the results of the pre-construction baseline monitoring for the Teesside Offshore Wind Farm. This monitoring was required as part of the conditions...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2014 post construction hydrographic and geophysical surveys of the Lincs windfarm and...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
This series contains DGN CAD files.
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
On the instructions of E.ON Climate & Renewables UK, Osiris Projects were
commissioned to undertake a pre-construction geophysical and scour monitoring survey
covering the proposed Robin Rigg...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
RPS Planning and Development were commissioned by DONG Energy Power (UK) Ltd. to undertake an assessment of the subtidal benthic ecology in the vicinity of the proposed Gunfleet Sands 3 (GFS 3)...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
On the instructions of E.ON UK Solway Offshore Ltd and E.ON UK Offshore Energy
Resources Ltd, Osiris Projects were commissioned to undertake a post-construction
geophysical survey covering the...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
This project examines the onshore and offshore elements of the environmental pre-construction monitoring undertaken at the site of the Barrow offshore wind farm to comply with the conditions of the...
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
In September 2014 EGS (International) Ltd was contracted to undertake the post
construction (6 month) survey of the Barrow and Walney OWFs and export cables.
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 10 July 2024
EGS (International) Ltd was contracted to undertake the 2013 Post-Construction hydrographic and geophyscial survey (Multibeam and side scan sonar systems) of the Lynn and Inner Dowsing (L&ID)...
- Published by:
- Ministry of Housing, Communities and Local Government
- Last updated:
- 26 February 2018
This data set contains rolling four quarter totals (England only) on house building starts. From 2011/12 imputed data is included. Imputed data should not be seen as an estimate for the individual...