Search results

Filter by

Remove filters

753 results found

WFD Cycle 2 River Phytobenthos Classification

This dataset is a subset of "WFD Classification Status Cycle 2" and contains classification data for phytobenthos in rivers. Phytobenthos or diatoms can be used to indicate the ecological status of...

Appointed Doctors Database

Contains details of doctors that are appointed in writing by HSE to conduct statutory medical surveillance under a range of HSE regulations relating to asbestos, chemicals, lead and working in...

Cervical screening programme

This report presents information about the NHS Cervical Screening Programme in England in and includes data on the call and recall system, on screening samples examined by pathology laboratories...

Calls for Service - Vegetation (includes weeds and overgrown hedges) - (Rolling 12 months)

Calls for Service - Vegetation (includes weeds and overgrown hedges) - (Rolling 12 months)

Integrated Communications Control System (ICCS)

Records all radio and telephone traffic

Survey Enquiry Line call logging system (CLOGGS)

All calls from public, or interviewers are recorded here and passed to other areas for resolution

UKCCSRC Call 1 project poster: Flexible CCS Network Development (FleCCSnet), CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Flexible CCS Network Development (FleCCSnet) was presented at the CSLF Call project poster reception, London, 27.06.16. Grant number: UKCCSRC-C1-40. The...

UKCCSRC Call 1 project poster: Oxyfuel and EGR Processes in GT Combustion, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Oxyfuel and exhaust gas recirculation processes in gas turbine combustion for improved carbon capture performance was presented at the CSLF Call project...

UKCCSRC Call 1 project poster: Determination of water Solubility in CO2 Mixtures, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Determination of water solubility limits in CO2 mixtures to deliver water specification levels for CO2 transportation was presented at the CSLF Call...

Ambulance Quality Indicators System Indicators

Information on the quality of care delivered by ambulance services, including the response times of ambulance crews, and the re-contact and call abandonment rates of patients Source agency: NHS...

Identicom Lone Worker Safety User Data

EA employees who work alone on site use a system called Identicom to ensure their safety by keeping track of their location. This is a typical year of data that provides system usage, false alarms...

UKCCSRC Call 2 project poster: Advanced Sorbents for CCS via Controlled Sintering, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Advanced Sorbents for CCS via Controlled Sintering was presented at the CSLF Call project poster reception, London, 27.06.16. Grant number: UKCCSRC-C2-206....

UKCCSRC Call 2 project poster: Multiscale Characterisation of CO2 Storage in the United Kingdom, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Multiscale Characterisation of CO2 Storage in the United Kingdom was presented at the CSLF Call project poster reception, London, 27.06.16. Grant number:...

UKCCSRC Call 1 project poster: Chemical Looping for low-cost Oxygen Production, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Chemical looping for low-cost oxygen production and other applications was presented at the CSLF Call project poster reception, London, 27.06.15. Grant...

UKCCSRC Call 1 project poster: Tractable equations of state for CO2 mixtures in CCS, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Tractable equations of state for CO2 mixtures in CCS was presented at the CSLF Call project poster reception, London, 27.06.16. Grant number:...

UKCCSRC Call 1 project poster: Multi-Phase Flow Modelling for Hazardous Assessment, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Multiphase flow modelling for hazard assessment of dense phase CO2 pipelines containing impurities was presented at the CSLF Call project poster reception,...

Private Finance Initiative (PFI) Data

We publish data on all current Private Finance Initiative (PFI) projects once a year. The information is provided by the departments and Devolved Administrations that procured or sponsored the...

Health, Safety and wellbeing actions issued

Health safety and wellbeing actions issued through a system called Safeguard . These actions are created and issued based on health and safety incidents, to highlight changes to internal...

Greenhouse Gas exchange data from Flanders Moss forest with associated temperature and soil water data

The effect of tree (lodgepole pine) planting with and without intensive drainage on soil greenhouse gas (GHG) fluxes was assessed after 45 yr at a raised peatbog in West Flanders Moss, central...

Preparer ID

A Registration Service for Preparers and Presenters together with Manufacturers holding name, address, email & telephone details etc.