Search results

Filter by

Remove filters

877 results found

Index of Multiple Deprivation Score, 2007

This dataset contains the scores underlying the Index of Multiple Deprivation, 2007. These figures combine values of many indicators into a single score that indicates the overall level of...

Index of Multiple Deprivation Rank, 2007

This dataset contains the main ranking for the Index of Multiple Deprivation, 2007. This dataset puts the 32,482 LSOAs into a rank order based on their 2007 IMD score. A rank of 1 is the most...

Hydrothermal Atomic Force Microscopy construction drawings (NERC Grant NE/P004024/1)

Graphite software drawings of hydrothermal Atomic Force Microscopy (AFM) parts. Each part is on a different file. Complete housing assembly drawing shows stacking of all different part on assembled...

2014, EGS, Walney Offshore Wind Farms, March Post-Construction Monitoring Survey

EGS International Ltd (EGSi) were contracted to undertake a post-construction survey of a number of selected turbines, one substation and several array cables within WOW 1 & 2. The aim of the...

2015, MarineSpace Ltd, London Array, Year 1 Post-Construction Monitoring Report

MarineSpace Ltd was commissioned by London Array Ltd to undertake a post-construction Annual Monitoring Report (AMR) for the London Array Offshore Wind Farm (OWF). The London Array OWF ...

2013, EGS Ltd, Ormonde Offshore Wind Farm, Post-Construction Geophysical Survey

EGSi have been contracted to conduct a detailed bathymetric and geophysical survey of the Ormonde OWF and export cable route that can be compared with the data collected from previous surveys in...

2005, EMU Ltd., Kentish Flats Offshore Windfarm, Post-Construction Debris Survey

This project relates to the post-construction surveys of the Kentish Flats Wind Farm site and export cable route that were carried out in accordance with the FEPA License and the PLA River Works...

2004, EMU Ltd., Kentish Flats Offshore Windfarm, Pre-Construction Debris Survey

In accordance with the FEPA licence, there is a requirement to undertake pre-construction and post-construction surveys of the Kentish Flats wind farm site to determine whether any debris has been...

2016, EGS, Lincs Offshore Wind Farm, Post Construction Geophysical Survey 2016

EGS International Ltd (EGSi) were contracted by Centrica Renewable Energy Limited (CREL) to undertake the 2016 post-construction (year 4) hydrographic and geophysical survey of the Lincs OWF. These...

2008, Emu Ltd, Kentish Flats Offshore Windfarm Post-Construction Swath Survey

In accordance with the FEPA licence, there is a requirement to undertake pre-construction and postconstruction surveys of a selection of turbine locations and the associated cable corridors to...

2008, Galloway Fisheries Trust, Robin Rigg, Construction Year Surveys of Migratory Fish

Construction year survey of migratory fish 2008 and 2009. Reports from Galloway Fisheries Trust. Comparisons have been made between the pre- construction phase (baseline) data and the construction...

2018, Ocean Ecology, Race Bank, Post-Construction year 1 Benthic Report

Completed in late 2017, Race Bank Offshore Wind Farm (ROW01) (The Project) is comprised of 91 x 6.3 Mega-Watt (MW) Wind Turbine Generators (WTGs), built on 7 m diameter monopile foundations. The...

2010, EGS, Lincs Offshore Wind Farm, Pre-Construction Baseline Survey Works

EGS (International) Ltd was contracted to undertake a geophysical survey of the LINCS OWF and cable route corridor in order to help determine the nature and distribution of broad scale sediment...

2015, Spectrum Geosurvey Limited, Kentish Flats Extension, Post Construction Survey 2015

Spectrum Geosurvey Limited was contracted by Vattenfall Wind Power Limited to perform a post construction survey on the Kentish Flats Extension offshore wind farm. The primary requirement was to...

2019, Ocean Ecology, Burbo Bank Extension, Post construction Benthic Ecology Survey

This report presents the findings of the second Burbo Bank Extension (BBW02) post-construction benthic survey undertaken by Ocean Ecology Limited (OEL) on behalf of Ørsted. The benthic survey was...

2011, Osiris Projects, Lincs Offshore Wind Farm, Pre-Construction Acoustic Survey

Osiris Projects were commissioned by MT Højgaard in January 2011, to carry out a pre-construction geophysical survey at the proposed Lincs offshore wind farm site, which lies approximately 8 - 12km...

2005, Osiris Projects, Barrow Offshore Wind Farm, Pre-Construction Geophysical Survey

On the instructions of RSKENSR Environment Limited, Osiris Projects were commissioned to carry out a pre-construction survey covering the proposed Barrow Offshore Wind Farm development site and...

2010, Galloway Fisheries Trust, Robin Rigg, Post-construction Migratory Fish Survey

Post-construction year surveys of migratory fish - Within this survey comparisons can now be made between the pre-construction phase (baseline) data, the construction phase data and the post...

2004, EMU Ltd., Kentish Flats Offshore Windfarm, Pre-Construction Debris Survey

In accordance with the FEPA licence, there is a requirement to undertake pre-construction and postconstruction surveys of the Kentish Flats windfarm site to determine whether any debris has been...

2017, EGS, Lincs Offshore Wind Farm, Post Construction Geophysical Survey 2017

EGS (International) Ltd was contracted by Centrica Renewable Energy Limited (CREL) to carry out a geophysical survey of the Lincs OWF, located offshore of Skegness on the east coast of England....