Search results

Filter by

Remove filters

132 results found

Borough Council Election Results 2014

[![](https://londondatastore-upload.s3.amazonaws.com/images/election14cover.JPG)](https://londondatastore-upload.s3.amazonaws.com/London-Borough-Council-Elections-2014.pdf) This report includes a...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 06: Technical Design - Pipeline and Platform

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 04: Project Design

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 08: Health and Safety

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Integrated Hydrological Units of the United Kingdom: Hydrometric Areas with Coastline

This dataset is part of Integrated Hydrometric Units (IHU) of the UK. Hydrometric Areas are used to organise river flow measurement and hydrometric data collection in the UK. Hydrometric Areas are...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 07: Technical Design - Well and Storage

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 05: Technical Design-Carbon capture and compression plant

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 09: Environment and Consent

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 10: Project Management Reports

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 01: Programme Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...

Municipal Recycling and Waste Strategy - Final Consultation Report

As is usual practice, the drafting of a new Strategy has been subject to a formal public consultation.  This report sets out the full findings from the council’s consultation. The findings will...

Caledonian Pinewood Inventory

Description: Scots pine (Pinus sylvestris L.) has the largest natural distribution of any conifer in the world, ranging from northern Norway to Spain, and from Scotland across Europe and Asia to...