Search results

Filter by

Remove filters

531 results found

2018, Natural Power Consultants Ltd., Blyth NaREC Offshore Demonstration Site, Post-Construction Benthic Monitoring - Array 2

Annex 2 of the Marine Licence (L/2013/00303) specified that a post-construction monitoring programme including benthic ecology surveys must be undertaken, which must also include a survey for Annex...

2018 - 2019, Natural Power Consultants Ltd., Blyth NaREC Offshore Demonstration Site, Post-Construction Fish and Shellfish Study

Blyth Offshore Demonstrator Ltd (BODL) has developed an offshore wind demonstration site off the Northumberland Coast close to the Port of Blyth. The Blyth Offshore Demonstration project (the...

2014-2015, DONG Energy Power (UK) Ltd., Walney Extension Offshore Wind Farm, WOW03 FLiDAR Wind Data

A FLiDAR has been positioned just outside of the Walney Extension Offshore Wind Farm boundary. This series documents all report and data collected/generated from this instrument.

Wildlife Enhancement Scheme Agreements (England)

Management Agreements were entered into by English Nature, and are now entered into by Natural England, with owners and occupiers of Sites of Special Scientific Interest (SSSI), and occasionally on...

North Norfolk District Council Compulsory Purchase Orders

Areas of land that have been acquired using compulsory purchase powers within North Norfolk

Conservation and Enhancement Scheme Agreements (England)

Agreements entered into by Natural England with owners and occupiers of Sites of Special Scientific Interest (SSSI), and occasionally on adjacent land. The purpose of these Agreements is to enable...

Areas of Outstanding Natural Beauty (England)

AONBs are designated areas where protection is afforded to protect and manage the areas for visitors and local residents. Under the Countryside and Rights of Way Act 2000, Natural England has the...

SEVIRI (Spinning Enhanced Visible and InfraRed Imager) Fire Radiative Power (FRP) data from the Meteosat Second Generation (MSG) Satellite

The Fire Radiative Power (FRP) is a measure of the rate of radiant heat output from a fire. It has been demonstrated in small-scale experimental fires that the FRP of a fire is related to the rate...

SEVIRI (Spinning Enhanced Visible and InfraRed Imager) Fire Radiative Power (FRP) data from the Meteosat Second Generation (MSG) Satellite

The Fire Radiative Power (FRP) is a measure of the rate of radiant heat output from a fire. It has been demonstrated in small-scale experimental fires that the FRP of a fire is related to the rate...

UKCCSRC Call 2 Project Final Report: Novel Reductive Rejuvenation approaches for degraded amine solvents from PCC in power plants

Final Report for UKCCSRC Call 2 Project C2-189. Novel Reductive Rejuvenation approaches for degraded amine solvents from PCC in power plants.

2016, Natural Power Consultants Ltd., Blyth NaREC Offshore Demonstration Site, Coquet to St. Mary's MCZ Assessment: Stage 1

The purpose of the document in this series is to present the findings of the Screening and Stage 1 MCZ assessment, carried out in line with the MMO guidance2, and follows on from the Pre-Screening...

2004-2005, Vattenfall Wind Power, Kentish Flats Offshore Wind Farm, Bird Monitoring Summary (December 2004 - November 2005)

This project analyses the results of the 17 boat surveys from December 2004 to November 2005 for the Kentish Flats Wind Farm, and includes aerial data collected over six surveys during the same...

article_4_direction

An Article 4 Direction is a special planning regulation adopted by a Local Planning Authority to provide additional powers of planning control in a particular location.

Data for the register of higher education providers regulated in England

This register lists higher education providers, which have particular relationships to Government (or bodies related to Government) in England. It sets out the powers they have, and the regulatory...

Fraud Data

This information relates to counter fraud work undertaken by the Council. The data relates mainly to the number of staff employed, number of investigations undertaken and the occasions when...

Fraud

Supporting Notes 1. The Council has not used powers under the Prevention of Social Housing Fraud (Power to Require Information) (England) regulations 2014 or similar powers as the Council does...

Compulsary Purchase Orders

Areas of land that have been acquired using compulsory purchase powers within Malvern HIlls District. Data supplied from the Local Land Charges Register.

Compulsary Purchase Orders

Areas of land that have been acquired using compulsory purchase powers within The London Borough of Tower Hamlets. Data supplied from the Local Land Charges Register.

2013, DONG Energy and Scottish Power Renewables, West of Duddon Sands Offshore Wind Farm, Pre-Construction Monitoring Report: Version E

This report presents the results from the pre-construction monitoring programme for West of Duddon Sands Offshore Windfarm and has been prepared to comply with Conditions associated with the Marine...

2011, Royal Haskoning DHV, North West Lewis Wave Farm, Coastal Geomorphology and Physical Environment

Lewis Wave Power Limited, a wholly owned subsidiary of Aquamarine Power, intends to develop a demonstration wave energy conversion array off the north-west coast of Lewis. Royal Haskoning has been...