Search results

Filter by

Remove filters

67 results found

2005 Strategic Environmental Assessment SEA6 Technical Report - Sea Mammal Research - Background Information on Marine Mammals (Irish Sea)

This report is a contribution to the Strategic Environmental Assessment (SEA6) conducted by the Department of Trade and Industry (now Department of Energy and Climate Change). Seven marine mammal...

2001 Strategic Environmental Assessment SEA2 Technical report - Background information on marine mammals in the North Sea

This report is a contribution to the Department of Trade and Industry's (now Department of Energy and Climate Change) Strategic Environmental Assessment SEA2. Eight marine mammal species occur...

2003 Strategic Environmental Assessment SEA4 Technical report - Marine mammals (north UKCS)

This report is a contribution to the Strategic Environmental Assessment (SEA4) conducted by the Department of Trade and Industry (now Department of Energy and Climate Change). Twelve marine mammal...

HMS Colossus Wrecking Project 2017

In December 1798 HMS Colossus, a 74 gun warship built in 1787 at Gravesend, was on her way home to England with wounded from the Battle of the Nile and with cargo, including part of Sir William...

2002 Strategic Environmental Assessment SEA3 Technical report - Marine mammals, North Sea (Addendum to SEA2 report)

This report is a contribution to the Strategic Environmental Assessment (SEA3) conducted by the Department of Trade and Industry (now Department of Energy and Climate Change) and is an addendum to...

Low Carbon Generators

Listing of low carbon energy generators installed on GLA group properties as requested in [question 2816/2010 to the Mayor](http://mqt.london.gov.uk/mqt/public/question.do?id=32699) during the...

SGN gas network - Scotland

SGN create 4 separate data layers (by pressure tier) to depict the location of their gas network: LP - Low Pressure (19 mbar - 75 mbar) MP - Medium Pressure (75mbar - 2 bar) IP...