Search results

Filter by

Remove filters

14,679 results found

NI 057 - Children and young peoples participation in high-quality PE and sport

Percentage of young people in England participating in sport. Young people are all those aged 5-19. All 5-16 year olds will have the chance to do 5 hours of high quality Physical Education (PE) and...

High Court Bulletin

This publication contains information on the High Court in Northern Ireland in relation to: chancery, Queen's Bench, judicial reviews, probate, wardship and adoption, matrimonial, bails, patients,...

Severn Estuary High Tide Waterbird Roost Sites (Gloucestershire)

Identification of wintering waterbird high tide roosts on the Severn Estuary SSSI/SPA completed in four phases:Phase 1 includes the Brean Down to Clevedon stretch. Phases 2 & 3 were completed...

Register a high-rise residential building service performance data

This page provides data on the performance of the Register a high-rise residential building service. The data is updated every 3 months.

Areas of High Archaeological Potential (EE7)

Policy from the Runnymede Borough Council 2030 Local Plan (Adopted 16th July 2020). Designated as Policy EE7, this dataset shows locations of important archaeological sites. The Runnymede Local...

GLA High Street Boundaries - map

Boundaries of High Streets as developed by the Regeneration team at the Greater London Authority. NOTE: these boundaries will be used when sharing data about High Street spend and footfall. They...

Permanent Forest Mensuration Sample Plot Network

Permanent forest mensuration sample plots that are re-measured every 5 or 10 years as part of a rolling annual programme. Data is collected from a sample of public and private woodland sites...

Average number of days to re-let empty properties (minus major works) - (YTD)

Average number of days to re-let empty properties (minus major works) - (YTD)

Average number of days to re-let empty properties (excluding temporary accommodation) - (YTD)

Average number of days to re-let empty properties (excluding temporary accommodation) - (YTD)

DSA 2013 Town Centre High Wycombe

Areas of land designated in High Wycombe Town Centre, Policies HWTC1-2, HWTC7-21, DM7 and DM15 of Development Site Allocations 2013, polygons

High Needs Funding Rates 2023/24

Place funding is allocated to: all types of special schools, apart from independent special schools all types of mainstream school with an SEN unit or RP, and/or a sixth form that has pupils...

Development High Risk Area

The Development High Risk Area is the part of the coal mining reporting area which contains one or more recorded coal mining related features which have the potential for instability or a degree of...

Severn Estuary High Tide Waterbird Roost Sites (Brean Down to Clevedon)

Identification of wintering waterbird high tide roosts on the Severn Estuary SSSI/SPA completed in four phases:Phase 1 includes the Brean Down to Clevedon stretch. Phases 2 & 3 were completed...

HMRC Data Catalogue

HMRC has developed an open data strategy, a detailed document laying out plans to publish information in a linkable and re-usable format with the aim to drive reform and improvement through...

HS2 Property Consultation 2014

High Speed 2 Property Consultation 2014 GIS Data

HS2 Phase Two: from the West Midlands to Leeds and Manchester

HS2 Phase 2b: from the West Midlands to Leeds and Crewe to Manchester The data provided here relates to information and/or engineering design published during the Development Phase of High Speed...

HS2 Injunctions

Extent of land contained within the High Court imposed injunction to restrain unlawful trespass on and obstruction of access to land on the route of the HS2 Scheme. A website URL is included to...

Severn Estuary High Tide Waterbird Roost Sites (Clevedon to Oldbury and Bridgwater Bay)

Identification of wintering waterbird high tide roosts on the Severn Estuary SSSI/SPA completed in four phases:Phase 1 includes the Brean Down to Clevedon stretch. Phases 2 & 3 were completed...

Severn Estuary High Tide Waterbird Roost Sites (Steart Marshes in Bridgwater Bay)

Identification of wintering waterbird high tide roosts on the Severn Estuary SSSI/SPA completed in four phases:Phase 1 includes the Brean Down to Clevedon stretch. Phases 2 & 3 were completed...

HS2 General Vesting Declarations

The High Speed Rail (London - West Midlands) Act 2017 and the High Speed Rail (West Midlands - Crewe) Act 2021 afford the Secretary of State for Transport the powers of compulsory acquisition of...