Search results

Filter by

Remove filters

795 results found

Sandwell MBC Continuous Air Quality Assessment -Annual Mean Pollutant Concentrations

Location of sites where air quality monitoring has been undertaken and the annual mean concentration for a range of pollutants has been calculated by Sandwell Metropolitan Borough Council. The...

Railway Link Set

A Railway Link Set depicts the full extent of a named railway as one continuous line. It may carry the name in more than one language.

SCORE (Scottish Continuous Recording System) Annual Summary Report

Annual summary of lettings made by Registered Social Landlords Source agency: Scottish Government Designation: Official Statistics not designated as National Statistics Language:...

Continuous measurements of temperature, pH, conductivity and dissolved oxygen in rivers [LOIS]

Continuous measurements of temperature, pH, conductivity and dissolved oxygen from river water at ten sites located within the rivers Swale, Derwent, Aire, Calder, Trent, Ouse and Nidd. Part of the...

National Diet and Nutrition Survey: Years 5-9

The National Diet and Nutrition Survey Rolling Programme (NDNS RP) is a continuous cross-sectional survey, designed to assess the diet, nutrient intake and nutritional status of the general...

Boundary High Water Mark

In the OS NGD Boundaries Collection, the mean high water (springs) mark is shown to the normal tidal limit (NTL). Areas of salt marsh, mudflats and so on often have extremely complicated tide...

Govt construction strategy strategic supplier data

Strategic supplier performance data to allow continuous improvement across government projects

Household estimates and projections

Household projections are trend-based and indicate the number of additional households that would form if recent demographic trends continue.

National Forest Estate Statutory Boundary for Forest of Dean

The Statutory Forest of Dean has existed since Norman times. Originally an area reserved for the King and his chosen few to hunt within, the Statutory Forest became defined as an area where the...

Vegetation and habitat data for fragmented and continuous forest sites in Sabah, Malaysian Borneo, 2017

This dataset contains records for vegetation in 49 plots across 14 fragmented forest sites and 4 continuous forest sites in Sabah, Malaysian Borneo. Living vegetation and deadwood were surveyed in...

Transition Zone Mapping for Marine-Terrestrial Archaeological Continuity (Contiguous Palaeo-Landscape Reconstruction)

The primary objective of this project was to produce a contiguous palaeo-landscape reconstruction across the marine to terrestrial boundary therefore enhancing the archaeological continuity across...

Transition Zone Mapping for Marine-Terrestrial Archaeological Continuity (Contiguous Palaeo-Landscape Reconstruction)

The primary objective of this project was to produce a contiguous palaeo-landscape reconstruction across the marine to terrestrial boundary therefore enhancing the archaeological continuity across...

Transition Zone Mapping for Marine-Terrestrial Archaeological Continuity (Contiguous Palaeo-Landscape Reconstruction)

The primary objective of this project was to produce a contiguous palaeo-landscape reconstruction across the marine to terrestrial boundary therefore enhancing the archaeological continuity across...

National Travel Survey (NTS)

National Travel Survey (NTS). A continuous household survey of personal travel in GB. Data collected from approx 20,000 individuals per year.

Social Housing Lettings & Sales

Information about social and affordable lettings and sales of social housing in England based on information reported through the Continuous Recording of Lettings (CORE) system for 2011 to 2012.

Government construction pipeline

The August 2015 Government Construction Pipeline is a forward look of government-funded construction projects as at April 2015 and includes approximately £118bn of investment to 2020 and beyond....

Outcomes for Children Looked After by Local Authorities in England

This publication covers a range of outcome indicators for children who have been continuously looked after for at least 12 months in England. Source agency: Education Designation: National...

Social Lettings Tables

Information about the characteristics of households receiving general needs social lettings. The figures are based on lettings information reported through the Continuous Recording of Lettings...

Dedication Woodland Grant Scheme England

The Dedication Scheme (Basis I & II) was introduced in 1947 in order to encourage landowners to retain their land in forestry and to introduce good forestry practice. Basis III was introduced...

NI 064 - Child protection plans lasting 2 years or more

The indicator measures the number of children who had been the subject of a Child Protection Plan continuously for two years or longer against the number of children ceasing to be the subject of a...