Search results

Filter by

Remove filters

1,224 results found

Survey : AMAR 2/96 (part of Solent Bass Pre-recruit Survey (FSS: SOLENT))

This survey was undertaken by Cefas as part of the Solent Bass Pre-recruit Survey (FSS: SOLENT); There are over 50 surveys in this series which began in 1983. The aim of these are to provide...

Survey : AMAR 1/89 (part of Solent Bass Pre-recruit Survey (FSS: SOLENT))

This survey was undertaken by Cefas as part of the Solent Bass Pre-recruit Survey (FSS: SOLENT); There are over 50 surveys in this series which began in 1983. The aim of these are to provide...

Survey : AMAR 1/83 (part of Solent Bass Pre-recruit Survey (FSS: SOLENT))

This survey was undertaken by Cefas as part of the Solent Bass Pre-recruit Survey (FSS: SOLENT); There are over 50 surveys in this series which began in 1983. The aim of these are to provide...

Survey : AMAR 1/95 (part of Solent Bass Pre-recruit Survey (FSS: SOLENT))

This survey was undertaken by Cefas as part of the Solent Bass Pre-recruit Survey (FSS: SOLENT); There are over 50 surveys in this series which began in 1983. The aim of these are to provide...

Survey : AMAR 2/93 (part of Solent Bass Pre-recruit Survey (FSS: SOLENT))

This survey was undertaken by Cefas as part of the Solent Bass Pre-recruit Survey (FSS: SOLENT); There are over 50 surveys in this series which began in 1983. The aim of these are to provide...

Survey : AMAR 2/00 (part of Solent Bass Pre-recruit Survey (FSS: SOLENT))

This survey was undertaken by Cefas as part of the Solent Bass Pre-recruit Survey (FSS: SOLENT); There are over 50 surveys in this series which began in 1983. The aim of these are to provide...

Survey : AMAR 2/92 (part of Solent Bass Pre-recruit Survey (FSS: SOLENT))

This survey was undertaken by Cefas as part of the Solent Bass Pre-recruit Survey (FSS: SOLENT); There are over 50 surveys in this series which began in 1983. The aim of these are to provide...

Survey : AMAR 1/99 (part of Solent Bass Pre-recruit Survey (FSS: SOLENT))

This survey was undertaken by Cefas as part of the Solent Bass Pre-recruit Survey (FSS: SOLENT); There are over 50 surveys in this series which began in 1983. The aim of these are to provide...

Survey : AMAR 1/91 (part of Solent Bass Pre-recruit Survey (FSS: SOLENT))

This survey was undertaken by Cefas as part of the Solent Bass Pre-recruit Survey (FSS: SOLENT); There are over 50 surveys in this series which began in 1983. The aim of these are to provide...

2007, Osiris Projects, Robin Rigg Offshore Wind Farm, Pre-construction Geophysical Survey

On the instructions of Robin Rigg Offshore Wind Limited, Osiris Projects were commissioned to undertake a pre-construction survey covering the proposed Robin Rigg Offshore Wind Farm development...

2008-2010, Ecology Consulting, Teesside Offshore Wind Farm, Pre-Construction Bird Surveys

This series contains a variety of bird surveys carried out within and around Teesside Offshore Wind Farm. Aerial, boat-based and shore-based surveys were undertaken between 2002 and 2010.

2007-2012, ECON, Lincs Offshore Wind Farm, Pre-construction Ornithological Baseline Surveys

Centrica commisionned ECON/ RPS to conduct thi pre-construction monitoring at the Lincs offshore wind farm site over a study area covering the site (plus a 1 km buffer) and adjacent control area of...

2014, Fugro EMU, Dudgeon Offshore Wind Farm, Pre-construction Baseline Ecology Study

DOW is located 32 km off the North Norfolk coast, in water depths of between 18 m and 25 m. The site will have a capacity of 402 MW (Mega Watts) and comprise of 67 wind turbine generators....

2008, RPS, Gunfleet Sands Offshore Wind Farm, Pre-construction Benthic Ecology Study

This project contains the results of benthic surveys at the Gunfleet Sands I and II offshore windfarm sites. The surveys were carried out by RPS hydrosearch on behalf of DONG Energy. Results...

2011, Entec UK Limited, Teesside Offshore Wind Farm, Pre-Construction FEPA Monitoring

This report was produced to provide a summary of the results of the pre-construction baseline monitoring for the Teesside Offshore Wind Farm. This monitoring was required as part of the conditions...

2002, North Hoyle Offshore Wind Farm, Pre-Construction Survey, DGN CAD Files

This series contains DGN CAD files.

2011, RPS/Titan, Gunfleet Sands 3, Pre-Construction Sub-tidal Benthic Monitoring

RPS Planning and Development were commissioned by DONG Energy Power (UK) Ltd. to undertake an assessment of the subtidal benthic ecology in the vicinity of the proposed Gunfleet Sands 3 (GFS 3)...

2005, RSKENSR Group, Barrow Offshore Wind Farm, Pre-construction Baseline Environmental Monitoring

This project examines the onshore and offshore elements of the environmental pre-construction monitoring undertaken at the site of the Barrow offshore wind farm to comply with the conditions of the...

2013, Subacoustech Environmental Ltd., Gunfleet Sands 3, Pre-Operational Underwater Noise Survey

This report presents the results of underwater noise measurements from a survey undertaken to in and around Gunfleet Sands Phase 3 Offshore Wind Farm. The Gunfleet Sands site is situated...

Survey : AMAR 1/92 (part of Solent Bass Pre-recruit Survey (FSS: SOLENT))

This survey was undertaken by Cefas as part of the Solent Bass Pre-recruit Survey (FSS: SOLENT); There are over 50 surveys in this series which began in 1983. The aim of these are to provide...