Bed level change within the Tollesbury managed realignment site, Blackwater estuary, Essex, UK between 1995 and 2007Download the data

You're previewing the first 4 rows of this file.

Download this file
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
05/09/1995 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Not set Not set Not set Not set Not set
05/10/1995 4.75 -1.1 -1.55 4.4 2.5 13.5 13.35 7.4 11.1 5.05 9.5 0.5 1.95 4.4 6.45 7.25 2.2 5.1 5.25 0.35 Not set Not set Not set Not set Not set
03/11/1995 8.6 2.8 1.75 8.5 1.45 31.75 22.2 19.15 17.6 5.55 13.95 -0.35 9.9 6.4 8.65 3.55 3 7.2 5.55 3.8 Not set Not set Not set Not set Not set
30/11/1995 15.5 3.55 4.45 7.85 7.35 37.85 28.55 21.5 19.2 7.9 14.85 0.1 7 11.2 19.55 6.55 5.2 6.75 4.45 3.6 Not set Not set Not set Not set Not set