Search results

Filter by

Remove filters

28 results found

LDP Viability Submarket Area

Viability Submarket areas designated in the Adopted Powys LDP (2011 - 2026) The Powys Local Development Plan (2011-2026) was adopted by Powys County Council on the 17th of April 2018 and became...

Barrow Port Area Action Plan Policy BP8 - Economic Viability of Port Operations

Areas affected by policy BP8 Economic Viability of Port Operations from the Barrow Port Area Action Plan. Areas are recorded as a polygon. Upon accessing this Licensed Data you will be deemed to...

Seed traits, seed viability and germination rates of seeds collected from 12 natural Juniper (Juniperus communis) populations in the UK, 2023-2025

These data describe the rates of filled, viable and germinating seeds from over 60 maternal juniper trees from across the UK. 12 populations from the Scottish Highlands to Southern English Downs...

UKCCSRC Call 1 Project: QICS2 Scoping Project - Exploring the viability and scientific opportunities of a follow-on marine impact project

A key element of risk assessment for the geological storage of CO2 offshore is the monitoring of transport of leaks from the subsurface via shallow sediments in the marine environment, including...

UKCCSRC Call 1 project poster: QICS2 Scoping: Exploring the Viability and Scientific Opportunities of a Follow-On Project, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project QICS2 Scoping Project: Exploring the Viability and Scientific Opportunities of a Follow-On Marine Impact Project was presented at the CSLF Call project...

Open-loop Ground Source Heat Pump viability screening map, England and Wales (OGC WxS INSPIRE)

The British Geological Survey (BGS) in collaboration with the Environment Agency (EA) has developed a web-based tool that provides an indication of whether suitable conditions exist in a given area...

Conservation Area

The current Conservation Areas for Cannock Chase District Council. These are used in conjunction with other layers to determine planning application viability as well as other planning and...

Primary Shopping Area

Defined as part of the South Norfolk Local Plan 2003. South Norfolk is creator of this data and it is reviewed and updated as part of the Local Plan process. Government Planning Policy Note PPG6...

Secondary Shopping Area

Defined as part of the South Norfolk Local Plan 2003. South Norfolk is creator of this data and it is reviewed and updated as part of the Local Plan process. Government Planning Policy Note PPG6...

UKCCSRC Call 2 project poster: UK Demonstration of Enhanced Calcium Looping & first Global Demonstration of Advanced Doping Techniques, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project UK Demonstration of Enhanced Calcium Looping and first Global Demonstration of Advanced Doping Techniques was presented at the CSLF Call project poster...

S2_S6_Town_Centres

Merged shopping policies S2, S3A, S4, S6. S2 to be maintained and enhanced vitality and viability of town centres (28), S3A prioritisation of refurbishment and enhancement of insecure S2 centres,...

1994-1996 Lindley et al. River Tamar and River Exe Acartia tonsa records

Acartia tonsa were found in the Tamar and Exe (http://jncc.defra.gov.uk/page-1706) when taking samples for experiments on eggs (See J.A. Lindley, P. Donkin, S.V. Evans, C.L. George, K.F. Uil.1999....

1994-1996 Lindley et al. River Tamar and River Exe Acartia tonsa records

Acartia tonsa were found in the Tamar and Exe (http://jncc.defra.gov.uk/page-1706) when taking samples for experiments on eggs (See J.A. Lindley, P. Donkin, S.V. Evans, C.L. George, K.F. Uil.1999....

Green Heat in Greenspaces (GHiGs) - Scotland

All GHiGs datasets cover the whole of Scotland and have been derived by Greenspace Scotland over the project period of September 2020 to April 2021. Principal third party data suppliers include: -...

Amber rated Large Projects - CYC

Amber rated Large Projects - CYC. RAG (red-amber-green) project rating is used in project management for indicating the progress of projects. This measure shows the number of council's large...

Red rated Large Projects - CYC

Red rated Large Projects - CYC. RAG (red-amber-green) project rating is used in project management for indicating the progress of projects. This measure shows the number of council's large...

Influence of riparian shade on stream thermal regime (New Forest 2010)

River temperature is a key parameter of water quality. Most bio-chemical processes and physical characteristics of a water body are functions of temperature. Aquatic organisms including fish are...

UKCCSRC Call 1 project poster: Determination of water Solubility in CO2 Mixtures, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 1 project Determination of water solubility limits in CO2 mixtures to deliver water specification levels for CO2 transportation was presented at the CSLF Call...

English Channel Gillnet Pollack Survey 2011/12 - Fisheries Science Partnership

This work was carried out as part of the Fisheries Science Partnership (FSP), a Defra-funded collaborative programme of scientific research between the UK fishing industry and...

Greenhouse gas emissions, nitrogen use efficiency and biomass from inorganic fertiliser additions to grassland at North Wyke and Henfaes, UK (2016)

The data consists of nitrogen (N) offtake, N emissions and soil N parameters, and herbage quality parameters from a three-cut silage plot trial located at two grassland sites within the UK...