2012-2013, E.ON, Humber Gateway Offshore Wind Farm, Pre-Construction Ornithological Monitoring Plan (OMP)

The Humber Gateway Project Marine Licence required pre-construction ornithological surveys to take place in the year preceding construction. The pre-construction OMP took place between January 2012...

2015 SSE Renewables Beatrice Offshore Wind Farm pre-construction drop down video survey

A pre-construction benthic characterisation survey was conducted by APEM Ltd at the proposed Beatrice Offshore Wind Farm (OWF) and Annex 1 Habitat Survey of the Offshore Transmission Works (OfTW)...

2015 SSE Renewables Beatrice Offshore Wind Farm pre-construction drop down video survey

A pre-construction benthic characterisation survey was conducted by APEM Ltd at the proposed Beatrice Offshore Wind Farm (OWF) and Annex 1 Habitat Survey of the Offshore Transmission Works (OfTW)...

2015 SSE Renewables Beatrice Offshore Wind Farm pre-construction benthic grab survey

A pre-construction benthic characterisation survey was conducted by APEM Ltd at the proposed Beatrice Offshore Wind Farm (OWF) and Annex 1 Habitat Survey of the Offshore Transmission Works (OfTW)...

2016; Royal Haskoning DHV, ESS Ecology, BioSS; Greater Gabbard Offshore Wind Farm; Final Ornithological Monitoring Report

As the final report for the ornithological monitoring programme at Greater Gabbard Offshore Wind Farm (GGOWF), this report provides the collation, analysis and presentation of the full...

2016; Royal Haskoning DHV, ESS Ecology, BioSS; Greater Gabbard Offshore Wind Farm; Final Ornithological Monitoring Report

As the final report for the ornithological monitoring programme at Greater Gabbard Offshore Wind Farm (GGOWF), this report provides the collation, analysis and presentation of the full...

2024, Natural Power Consultants Ltd, Thanet Offshore Wind Farm, Benthic Survey

Within the Environmental Statement (ES) for the development of the Thanet OWF, Thanet Offshore Wind Limited committed to undertaking three post-construction monitoring surveys over a ten-year...

2017-2018 Jon Ford Environmental Consultancy Kentish Flats Extension Offshore Wind Farm Post Construction Bird Surveys

This report presents the results of the bird monitoring programme that has been undertaken between October 2017 and March 2018, and summarises the overall results from that programme....

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 08: Health and Safety

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...