Search results

Filter by

Remove filters

115 results found

Spend in Yorkshire Forward

A monthly-updated list of all financial transactions spending made by Yorkshire Forward., as part of the Government's commitment to transparency in expenditure. Software changes would be required...

Forward Control Points

Forward Control Points (FCP) with Emergency Meeting Points (EMP) located adjacent the River Ouse in York. For further information about river safety please visit [City of York Council's...

Warrington Borough Council procurement forward plan

This page lists information on the procurement forward plan which details upcoming contracts over £50,000 in value.

Thames Estuary Production Corridor: Fashion Design and Manufacturing Sector: evidence base and emerging areas of action

This dataset was collated to provide evidence for supporting and investing in the high growth fashion design and manufacturing sector in the Thames Estuary region. This evidence base was created as...

% of rent collected (including current arrears brought forward) - (Snapshot)

% of rent collected (including current arrears brought forward) - (Snapshot) *This indicator has been discontinued

Deployment Specific Forward Inventory Information System

Presentation tools – and associated data sets - that advise how many of which piece parts are expected to be needed for specific deployments of Maritime units on Operations and Exercises.

East of England Forecasting Model 2013 Baseline

The East of England Forecasting Model projects economic, demographic and housing trends in a consistent fashion. It covers a wide range of variables, and is designed to be flexible so that...

East of England Forecasting Model 2013 Baseline for Cambridgeshire

The East of England Forecasting Model projects economic, demographic and housing trends in a consistent fashion. It covers a wide range of variables, and is designed to be flexible so that...

Species point records from 1989 FSCRC Daucleddau Estuary (Milford Haven) littoral survey

This survey was carried out by Alan Hern as a placement study looking at physio-chemical parameters of the Daucleddau Estuary. A total of 31 stations were sampled and arranged in a linear fashion...

Habitat point records from 1989 FSCRC Daucleddau Estuary (Milford Haven) littoral survey

This survey was carried out by Alan Hern as a placement study looking at physio-chemical parameters of the Daucleddau Estuary. A total of 31 stations were sampled and arranged in a linear fashion...

In year Business Forecast Reviews

Actual P&L, Manpower, Demand information and forward forecast

In Year Monthly Management Accounts

Actual P&L information and forward forecast with workings

IRMS (Import Risk Management System)

Excel spreadsheet used for the central collation of importation figures, forwarded by each regional Animal Health and Veterinary Laboratories Agency (AHVLA) Office.

Stamp Duty Model

Sampled Base year MSD data and SAS code to project this data forward using HMT assumptions on property prices and transaction volumes growth

Planned Procurement Q1-Q3 2014-15

A forward look incorporating details of invitations to tender or invitations to quote that are likely to be issued in the next 12 months.

Planned Procurement Q4 2014-15

A forward look incorporating details of invitations to tender or invitations to quote that are likely to be issued in the next 12 months.

Hackney Estate Renewal

Approved initial investment to bring forward the Council's ambition to improve both the quality and number of homes available in the borough through an estate renewal programme.

Estate Renewal

Approved initial investment to bring forward the Council's ambition to improve both the quality and number of homes available in the borough through an estate renewal programme.

Experimental friction data for different grain size quartz gouges under different effective normal stresses (NERC Grant NE/P002943/1)

The data are from a suite of friction experiments performed on 3 different grain size quartz gouges (5, 15 and 30 microns). The quartz gouge layers were sheared under a range of effective normal...

Home Office Annual Report

The annual report sets out the vision and priorities of the department over the past year, including progress against our priorities, and also sets out what the aims of the department are going...