Search results

Filter by

Remove filters

208 results found

Total Diet Study (TDS) Analysis

Preparation and analysis of total diet study

Flexible Support Fund

The Flexible Support Fund forms part of the overall Jobcentre Plus Pre-Work Programme Offer and is used to fill gaps and add support where DWP provision, non contracted partner provision or adviser...

The National Diet and Nutrition Survey

The survey was designed to meet the aims of the National Diet and Nutrition Survey (NDNS) programme in providing detailed information on the current dietary behaviour and nutritional status of...

Mobile and Flexible Working survey

Survey of HMRC staff working patterns and attitudes to mobile/flexible working. Updated: one-off survey. Data coverage: 2013/14

Diet, gut microbiome and parasite data from wild rodents and diet shift data from captive rodents, 2014-2018

This dataset is a combination of data obtained from a longitudinal live trapping study of wild rodents in Wytham Woods, Oxford (51.796 N,-1.367 W); October 2015-18), a dissection study of rodents...

National Diet and Nutrition Survey: Years 5-9

The National Diet and Nutrition Survey Rolling Programme (NDNS RP) is a continuous cross-sectional survey, designed to assess the diet, nutrient intake and nutritional status of the general...

Article 4 Direction - Flexible Town Centre

Article 4 Direction Flexible Town Centre in Hackney - An Article 4 Direction (A4D) is part of planning legislation that allows the Council to remove permitted developments rights including changes...

Pacific oyster physiology data with different microalgal diets 2020-2022

72 adult Pacific oysters collected from Woolston bay in Southampton in October 2021 and fed one of three microalgal diets: Isochrysis galbana, Nannochloropsis gaditana/oculata, or an equal mix of...

Modern workplaces consultation: government response. Equality impact assessment (EQIA) on flexible parental leave and flexible working

Data from the impact assessment for proposals to make employment practices in the UK more flexible and family-friendly. The data provides ethnic breakdown of male employees; male employees with a...

National Diet and Nutrition Survey 2017 to 2023 Report for Northern Ireland

This report presents results from 2017-2023 of the National Diet and Nutrition Survey (NDNS) for Northern Ireland. NDNS is a continuous cross-sectional survey, designed to assess the diet, nutrient...

Modern workplaces consultation: government response on flexible working. Impact assessment

Data supporting the impact assessment for proposals to extend the right to request flexible working to all employees. These proposals aim to facilitate the employee-employer information exchange...

Modern workplaces [consultation]: government response on flexible parental leave. Impact assessment.

Data supporting the impact assessment for proposals on extending flexible parental leave in the closed consultation on modern workplaces (URN 11/699). The new system of flexible parental leave aims...

Diet - x5 or more Fruit and Veg a day - 2014

Data showing Diet - x5 or more Fruit and veg a day - Plymouth - 2014 from the Health and Wellbeing Survey 2014

Statistics on Obesity, Physical Activity and Diet, England

This statistical report presents a range of information on obesity, physical activity and diet, drawn together from a variety of sources. The topics covered include: - Overweight and obesity...

Hackney Article 4 Directions - Flexible Town Centre Use

Article 4 Direction (A4D) is part of planning legislation that allows the Council to remove permitted development rights including changes of use from an area or a particular property. This dataset...

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Update, 06.03.14

This is a blog (Update, 06.03.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Workshop1, 30.04.14

This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.