Search results

Filter by

Remove filters

117 results found

Incidence of harm to children due to ‘failure to monitor’ (retired as of May-15) (NHSOF 5.6)

The total number of safety incidents, causing harm to children due to 'failure to monitor', reported to the National Reporting and Learning System (NRLS) by provider organisations. Please note...

International Waste Shipments into England – indicative

This record is for Approval for Access product AfA415. Records of International shipments permitted under the Transfrontier Shipment of Waste Regulations 2007. Shipments into or out of the UK...

International Waste Shipments from England – indicative

This record is for Approval for Access product AfA414. International Waste Shipments Records of International shipments permitted under the Transfrontier Shipment of Waste Regulations 2007....

International Waste Shipments exported to England

This record is for Approval for Access product AfA330. International Waste Shipments Records of International shipments permitted under the Transfrontier Shipment of Waste Regulations 2007....

International Waste Shipments received in England

This record is for Approval for Access product AfA331. International Waste Shipments Records of International shipments permitted under the Transfrontier Shipment of Waste Regulations 2007....

International Waste Shipments received from England

This record is for Approval for Access product AfA329. International Waste Shipments Records of International shipments permitted under the Transfrontier Shipment of Waste Regulations 2007....

UK Punctuality Statistics

Punctuality statistics are calculated for 10 UK Airports. The planned time of operation is obtained from the airport scheduling committees and merged in with the actual time of operation on the air...

Site Allocations

Sites have been allocated as part of the planning process to make sure Tower Hamlets has the infrastructure needed to support the anticipated level of growth set out in the Core Strategy,...

Housebuilding completions per 1000 households

This data set gives annual figures for the number of house building completions per 1000 households. House building data are collected at local authority district level and are available on ODC...

Sitka spruce Population Study. A study in the natural variation of economic traits within an unselected population of Sitka spruce

The operational Sitka spruce selection and breeding programme commenced in 1963 with the selection in British forests of superior individuals for height, diameter, stem straightness and branching...

COLDTREE project data on cold tolerance and dormancy assessments in pine and beech

Summarising, the objectives of the Coldtree project were: To identify novel physiological, and genetic techniques indicative of the onset of winter hardiness and dormancy in woody species and,...

London Borough of Camden Pension Fund Alternative Investments

A list of pension fund alternative investments; please note there are different currencies. This dataset is updated with a delay of 1 year - so the latest information will show up to and including...

Bus lane fines

Data files that contain every fine issued for unauthorised vehicles being in bus lanes. The data contains date, time, location, fine issued, discount available, and total paid. Additional...

Flood Map for Planning (Rivers and Sea) - Flood Storage Areas

The Flood Map for Planning (Rivers and Sea) includes several layers of information. This dataset covers Flood Storage Areas. It shows those areas that act as a balancing reservoir, storage basin...

Lightning Strikes Map Layer

An image showing lightning strike frequency, in strikes per minute, presented as a single tile map overlay. Images are updated every 15 minutes with a 15 minute delay due to processing times.

Climate change allowances - peak rainfall by management catchment

This dataset contains peak rainfall allowances showing the anticipated changes to peak rainfall by management catchment. It contains information generated by Met Office Hadley Centre The...

Isle of Dogs and South Poplar Integrated Water Management Plan

An Integrated Water Management Plan (IWMP) for the Isle of Dogs and South Poplar Opportunity Area prepared by the Greater London Authority in partnership with LB Tower Hamlets, also encompassing...

Monthly key performance indicators

Monthly key performance indicators. KPI 11 and KPI 18 includes booking number, Date of Test and Incident Number for all candidates who have had a test cancelled by Pearson, or received a result in...

Radar Rainfall Map Layer

A set of single tile images in the form of map overlays to show recent rain rates in mm/hour over the UK. Single tile map layer images are updated every 15 minutes with a 15 minute delay...

Impact indicator: planning authorities with local plan

Percentage of local planning authorities having an adopted local plan #### How the figure is calculated: It is the number of Local Planning Authorities with an adopted plan as a percentage of...