Filter by
Remove filters
19
results found
- Published by:
- Food Standards Agency
- Last updated:
- 24 November 2016
This dataset shows the top two levels of the file plan which is used to structure records stored in Wisdom, the FSA Electronic Document Management System. The file plan is a two level list of the...
- Published by:
- Hastings Borough Council
- Last updated:
- 21 October 2014
Planning Focus Areas are areas where there is an identifiable community or geography or where landscape or function means they make a logical area for spatial planning as defined in the Hastings...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 11 June 2020
This dataset contains a shapefile that shows the potential and high confidence mapped extents of Annex I habitat 'Sandbank' within the boundaries of the UK continental shelf. 'Sandbank' here refers...
- Published by:
- Scottish Government SpatialData.gov.scot
- Last updated:
- 09 March 2022
Many countries around the world have begun to adopt zonation systems as a strategic framework to guide their approach to the conservation, enhancement, understanding and use of the natural...
- Published by:
- Joint Nature Conservation Committee
- Last updated:
- 01 July 2019
This dataset contains a shapefile that shows the potential and high confidence mapped extents of Annex I habitat 'Sandbank' within the boundaries of the UK continental shelf. 'Sandbank' here refers...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 11 May 2022
The map show the broad distribution of the industrial, including construction, mineral resources of Britain and the main sites where these are worked. Over extensive areas bedrock is covered by...
- Availability:
-
Not released
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 13 October 2014
Teesside Offshore Wind Farm (OWF) is a 62 MW site comprised of 27 turbines, and is owned and operated by Teesside Windfarm Limited (TWL). Osiris Projects were contracted to provide surveys in...
- Availability:
-
Not released
- Published by:
- Marine Environmental Data & Information Network
- Last updated:
- 13 October 2014
Teesside Offshore Wind Farm (OWF) is a 62 MW site comprised of 27 turbines, and is owned and operated by Teesside Windfarm Limited (TWL). Osiris Projects were contracted to provide surveys in...
- Published by:
- Environment Agency
- Last updated:
- 28 March 2022
The Environment Agency National LIDAR Programme aims to provide accurate elevation data at 1m spatial resolution for all of England by the end of 2021. The country has been divided into...
- Published by:
- City of Bradford Metropolitan District Council
- Last updated:
- 13 April 2022
An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...
- Published by:
- City of Bradford Metropolitan District Council
- Last updated:
- 10 March 2020
An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...
- Published by:
- City of Bradford Metropolitan District Council
- Last updated:
- 10 March 2020
An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...
- Published by:
- City of Bradford Metropolitan District Council
- Last updated:
- 10 March 2020
An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...
- Availability:
-
Not released
- Published by:
- City of Bradford Metropolitan District Council
- Last updated:
- 02 July 2021
An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...
- Published by:
- City of Bradford Metropolitan District Council
- Last updated:
- 13 April 2022
An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...
- Published by:
- City of Bradford Metropolitan District Council
- Last updated:
- 13 April 2022
An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...
- Availability:
-
Not released
- Published by:
- City of Bradford Metropolitan District Council
- Last updated:
- 07 July 2021
An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 11 May 2022
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...
- Published by:
- British Geological Survey (BGS)
- Last updated:
- 11 May 2022
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...