Search results

Filter by

Remove filters

19 results found

Food Standards Agency File Plan

This dataset shows the top two levels of the file plan which is used to structure records stored in Wisdom, the FSA Electronic Document Management System. The file plan is a two level list of the...

Planning Focus Areas

Planning Focus Areas are areas where there is an identifiable community or geography or where landscape or function means they make a logical area for spatial planning as defined in the Hastings...

Annex I Sandbanks in the UK version 3 - 2019 (Public) Polygons

This dataset contains a shapefile that shows the potential and high confidence mapped extents of Annex I habitat 'Sandbank' within the boundaries of the UK continental shelf. 'Sandbank' here refers...

Natural Heritage Futures

Many countries around the world have begun to adopt zonation systems as a strategic framework to guide their approach to the conservation, enhancement, understanding and use of the natural...

Annex I Sandbanks in the UK v2 (Public)

This dataset contains a shapefile that shows the potential and high confidence mapped extents of Annex I habitat 'Sandbank' within the boundaries of the UK continental shelf. 'Sandbank' here refers...

Industrial minerals resources map of Britain

The map show the broad distribution of the industrial, including construction, mineral resources of Britain and the main sites where these are worked. Over extensive areas bedrock is covered by...

2014-026 Teeside Geophysical Survey Charting and Reporting

Teesside Offshore Wind Farm (OWF) is a 62 MW site comprised of 27 turbines, and is owned and operated by Teesside Windfarm Limited (TWL). Osiris Projects were contracted to provide surveys in...

2014-026 Teeside Geophysical Survey Charting and Reporting

Teesside Offshore Wind Farm (OWF) is a 62 MW site comprised of 27 turbines, and is owned and operated by Teesside Windfarm Limited (TWL). Osiris Projects were contracted to provide surveys in...

National LIDAR Programme

The Environment Agency National LIDAR Programme aims to provide accurate elevation data at 1m spatial resolution for all of England by the end of 2021. The country has been divided into...

Leeds Road Water Level Monitor

An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...

Sacred Heart School Water Level Monitor

An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...

Leeds Road Water Level Monitor

An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...

Ilkley Moor Water Level Monitor

An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...

Leeds Road Water Level Monitor

An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...

Sacred Heart School Water Level Monitor

An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...

Ilkley Moor Water Level Monitor

An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...

Ilkley Moor Water Level Monitor

An NFM project on Backstone Beck in Ilkley will begin in 2019. This approach to managing flood risk is also referred to as 'Working with Natural Processes' (WwNP). The two terms mean the same thing...

Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering and Design (FEED) - Chapter 10: Project Management Reports

During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the development of a commercial...

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 01: Programme Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering,...