Search results

Filter by

Remove filters

71 results found

Administrative Boundaries - Partnership and Strategic Overview Teams

Environment Agency Partnership and Strategic Overview teams understand and manage flood and coastal erosion risk by working flexibly with partners in ways that are good value and benefit...

Woodland predation shadow for waders

The data describes the potential area of impact of ‘significant’ areas of woodland upon breeding wading birds due to the predation shadow associated with the woodland. The purpose is to support...

Delivery Directorate Performance Report

Contract performance for Contracted Employment Provision. Initial releases contained Flexible New Deal (FND) figures for starts and jobs broken down by contract package area. NOTE: As of 1 June...

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Workshop1, 30.04.14

This is a blog (Workshop1, 30.04.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1ES, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1ES, 30.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project blog: Flexible CCS Network Development, Update, 06.03.14

This is a blog (Update, 06.03.14) on the UKCCSRC Call 1 project, Flexible CCS Network Development. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Workshop1, 30.04.14

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Workshop1, 30.04.14. Grant number: UKCCSRC-C1-40.

Land Capability for Forestry, Scotland

The main use of the Land Capability Classification for Forestry is as an aid to decision-making at broad planning levels, as a guide for land managers and as a statement of the natural resources of...

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cambridge Biannual, 02.04.14

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cambridge Biannual, 02.04.14. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project presentation: Flexible CCS Network Development, Cranfield Biannual, 22.04.15

This presentation on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 22.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 1 project poster: Flexible CCS Network Development, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 1 project, Flexible CCS Network Development, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C1-40.

UKCCSRC Call 2 project poster: Flexible CCS operations combined with online solvent monitoring: A pilot-scale study, CSLF Call project poster reception, London, 27.06.16

This poster on the UKCCSRC Call 2 project Flexible CCS operations combined with online solvent monitoring: A pilot-scale study was presented at the CSLF Call project poster reception, London,...

UKCCSRC Call 2 project poster: Towards more flexible power generation with CCS, Cranfield Biannual, 21.04.15

This poster on the UKCCSRC Call 2 project, Towards more flexible power generation with CCS, was presented at the Cranfield Biannual, 21.04.15. Grant number: UKCCSRC-C2-214.

UKCCSRC Call 2 Project C2-214 - Sulzer Chemtech dynamic test campaign data, Jan 2015

This dataset relates to the scientific journal article "A pilot-scale study of dynamic response scenarios for the flexible operation of post-combustion CO2 capture" (Tait et al. 2016), a study...

Species point records from 1965-70 DAFS Scottish littoral sediment survey

The study of a number of sandy beaches covering a range of environmental conditions revealed faunistic variation which reflected the different species' tolerance of or preference for the conditions...

Habitat point records from 1965-70 DAFS Scottish littoral sediment survey

The study of a number of sandy beaches covering a range of environmental conditions revealed faunistic variation which reflected the different species' tolerance of or preference for the conditions...

Open Spaces

Dataset displaying open spaces in Runnymede. This includes parks & gardens, outdoor sports facilities, amenity green spaces, play areas and more. This dataset has been released as open data....

East of England Forecasting Model 2013 Baseline

The East of England Forecasting Model projects economic, demographic and housing trends in a consistent fashion. It covers a wide range of variables, and is designed to be flexible so that...

UKCCSRC Call 1 project paper: Operational flexibility options in power plants 1 with integrated post-combustion capture

Flexibility in power plants with amine based carbon dioxide (CO2) capture is identified in the literature as a way of improving power plant revenues. Despite the prior art, the value of flexibility...

CO2 leakage detection

UKCCSRC Flexible Funding 2020. Experimental data are the acoustic emission (AE) signals collected with three AE sensors when CO2 leak from a CO2 storage cylinder under different pressures....