UKCCSRC Call 1 project paper: Operational flexibility options in power plants 1 with integrated post-combustion capture
Flexibility in power plants with amine based carbon dioxide (CO2) capture is identified in the literature as a way of improving power plant revenues. Despite the prior art, the value of flexibility in power plants with CO2 capture as a way to improve power plant revenues is still unclear. Most studies are based on simplifying assumptions about the capabilities of power plants to operate at part load and to regenerate additional solvent after interim storage of solvent. This work addresses this gap by examining the operational flexibility of coal power plants with amine based CO2 capture, using a rigorous fully integrated model. The part-load performance, with capture and compression bypass, and with interim solvent storage with delayed regeneration, of two coal power plant configurations designed for base load operation with capture, and with the ability to fully bypass capture, is reported. With advanced integration options, including boiler sliding pressure control, uncontrolled steam extraction with a floating crossover pressure, constant stripper pressure operation and compressor inlet guide vanes, a significant reduction of the electricity output penalty at 50% fuel input is observed, from 458 kWh/tCO2 to 345 kWh/tCO2, compared to a reduction from 361 to 342 kWh/tCO2 at 100% fuel input. Advanced integration options for improved part-load allow for maximum additional solvent regeneration, although to a lower magnitude than conventional integration options. The latter can maintain CO2 flow export within 10% of maximum flow across 30% to 78% of MCR (Maximum continuous rating). One hour of interim solvent storage at 100% MCR is evaluated to be optimally regenerated in 4 hrs at 55%MCR, and 3 hours at 30% MCR, providing rigorously validated useful guidelines for the increasing number of techno-economic studies on power plant flexibility, and CO2 flow profiles for further studies on integrated CO2 networks. The paper is available at http://www.sciencedirect.com/science/article/pii/S1750583616300275, DOI: doi:10.1016/j.ijggc.2016.01.027.
nonGeographicDataset
http://www.sciencedirect.com/science/article/pii/S1750583616300275
function: download
http://www.bgs.ac.uk/ukccs/accessions/index.html#item78109
function: information
http://data.bgs.ac.uk/id/dataHolding/13606878
eng
geoscientificInformation
publication
2008-06-01
UKCCS
NGDC Deposited Data
Carbon capture and storage
revision
2022
NERC_DDC
2013-09
2016-02
publication
2016-02
notApplicable
See the journal publication for details
publication
2011
false
See the referenced specification
publication
2010-12-08
false
See http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2010:323:0011:0102:EN:PDF
The copyright of materials derived from the British Geological Survey's work is vested in the Natural Environment Research Council [NERC]. No part of this work may be reproduced or transmitted in any form or by any means, or stored in a retrieval system of any nature, without the prior permission of the copyright holder, via the BGS Intellectual Property Rights Manager. Use by customers of information provided by the BGS, is at the customer's own risk. In view of the disparate sources of information at BGS's disposal, including such material donated to BGS, that BGS accepts in good faith as being accurate, the Natural Environment Research Council (NERC) gives no warranty, expressed or implied, as to the quality or accuracy of the information supplied, or to the information's suitability for any use. NERC/BGS accepts no liability whatever in respect of loss, damage, injury or other occurence however caused.
University of Edinburgh
pointOfContact
British Geological Survey
The Lyell Centre, Research Avenue South
EDINBURGH
EH14 4AP
United Kingdom
+44 131 667 1000
pointOfContact
2025-03-24