WFD (Water Framework Directive) Cycle 1 and Cycle 2 water body change log
This spreadsheet contains information regarding changes made to water bodies (and their spatial representations) reported in the two WFD (Water Framework Directive) cycle RBMP (River Basin Management Plans). Please note that the Environment Agency no longer provide classification data for water bodies in Wales - this is now available from Natural Resources Wales. However, this data DOES include Wales since EA did report welsh data in Cycle 1. Attribution statement: © Environment Agency copyright and/or database right 2016. All rights reserved.
dataset
https://ea.sharefile.com/d-se7d496c13174fa9b
protocol:
name:
description: External version on Defra Data Services Platform
https://support.environment.data.gov.uk/hc/en-gb
protocol: http:
name: DSP_CUSTOMER_FORUM
description: DEFRA Data Services Platform Customer Forum
a8ffc88a-a242-4edb-a368-d17b134f29f2
eng
environment
OpenData
water body changes
water body
publication
2010-01-13
-6.236
2.072
55.816
49.943
http://data.ordnancesurvey.co.uk/doc/country/england
2009-12-31
2015-12-31
creation
2016-07-29
revision
2017-12-08
asNeeded
Post Cycle 1 the river water bodies were mapped from the 1:50k CEH river centreline to the Detailed River Network, the Agency’s high quality river network. As part of this process, a QA of the water bodies (used in the first River Basin Management Plans) was carried out to ensure that they were sensible and fit for purpose. This review was carried out by our Area staff, and tried to address known issues raised by external parties, as well as their own concerns. The review included all the water body categories. All defined water bodies comply with the guidance for the definition of water bodies taken from the WFD, the implementation guidance, and further instruction from defra. In the majority of cases there was little or no change from the water body reported in the first cycle River Basin Management Plan (RBMP). In others, due to extensive merging or splitting of water bodies, there was a significant change. This process resulted in the creation of some new water bodies, eg by splitting a large water body into 2 small new ones, as well as the removal of many small water bodies which were below the size thresholds set out in the WFD guidance.
Open format | MS Excel (XLSX)
Not Applicable
Open Government Licence
There are no public access constraints to this data. Use of this data is subject to the licence identified.
Environment Agency
DSPcustomerforum@environment-agency.gov.uk
https://support.environment.data.gov.uk/hc/en-gb
description: Defra Data Services Forum
pointOfContact
Environment Agency
metadata@environment-agency.gov.uk
pointOfContact
2020-03-19