Identification

Title

Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium Front End Engineering and Design (FEED) - Chapter 01: Programme Abstract

Abstract

In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from an engineering, commercial and regulatory, perspective in order to progress the CCS demonstration project at Longannet Power station in Scotland through to construction. The study yielded invaluable knowledge and the resulting material are available for download here. This chapter contains the output from many of the Project Management processes which control and report the progress of the FEED. The following commentary gives the reader a brief guide to the project management process or approach which has been used. FEED Programme: In order to scope out, control and report the FEED activity, a Work Breakdown Structure was developed. This structure had the following hierarchy - Level 1 - Chain Element; Level 2 - Phase; Level 3 - Discipline; Level 4 - Work Package (including Cost Time Resource definition); The programme is in the form of a fully resource loaded, logically linked network diagram. Risk Management: Throughout this FEED the management of risk was a key activity. This has helped inform and better understand the important risks faced by the project. This 'first of a kind' project saw a large number of new risks being identified, assessed, controlled and monitored during FEED. Project Cost Estimates: An estimating philosophy was established in FEED to set the standards for the estimates produced from across the project participants, including: To ensure a consistent approach in the collection, calculation and presentation of costs across all FEED Participants; To ensure that all likely project costs are identified and captured along with all associated details. A standard template was established for each participant to complete with the details of their section (i.e. Chain Element) of the cost estimate. The cost estimate was broadly consistent with Class 3/4 estimate as defined by AACE. Further supporting documents for chapter 10 of the Key Knowledge Reference Book can be downloaded. Note this dataset is a duplicate of the reports held at the National Archive which can be found at the following link - http://webarchive.nationalarchives.gov.uk/20121217150421/http://decc.gov.uk/en/content/cms/emissions/ccs/ukccscomm_prog/feed/scottish_power/abstract/abstract.aspx

Resource type

nonGeographicDataset

Resource locator

http://www.bgs.ac.uk/ukccs/accessions/index.html#item37321

function: download

Unique resource identifier

code

http://data.bgs.ac.uk/id/dataHolding/13606472

codeSpace

Dataset language

eng

Spatial reference system

code identifying the spatial reference system

Additional information source

http://webarchive.nationalarchives.gov.uk/20121217150421/http:/decc.gov.uk/en/content/cms/emissions/ccs/ukccscomm_prog/feed/feed.aspx

Classification of spatial data and services

Topic category

geoscientificInformation

Keywords

Keyword set

keyword value

originating controlled vocabulary

title

GEMET - INSPIRE themes

reference date

date type

publication

effective date

2008-06-01

Keyword set

keyword value

Carbon

originating controlled vocabulary

title

BGS Thesaurus of Geosciences

reference date

date type

revision

effective date

2011

Keyword set

keyword value

NERC_DDC

Geographic location

West bounding longitude

East bounding longitude

North bounding latitude

South bounding latitude

Temporal reference

Temporal extent

Begin position

2010-03

End position

2011-04

Dataset reference date

date type

publication

effective date

2011-04

Frequency of update

notApplicable

Quality and validity

Lineage

ScottishPower began developing the Longannet Carbon Capture and Storage project in 2007 in response to the UK Government’s competition to demonstrate full-scale CCS on power generation in the UK. In the summer of 2009, the ScottishPower CCS Consortium, comprising ScottishPower, National Grid and Shell was formed to further develop this project, which could be one of the world’s first full-scale CCS demonstration plants. In March 2010, the Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what exactly would be required from an engineering, commercial and regulatory, perspective in order to progress the CCS project through to construction. At the heart of that year long study was a commitment by both the Government and the Consortium to undertake one of the most extensive knowledge transfer programmes ever undertaken on CCS. On the 19 October 2011, the UK Government announced that negotiations with the ScottishPower CCS Consortium have concluded. The decision has been taken not to proceed with the first CCS demonstration project at Longannet Power station in Scotland. Despite all parties working extremely hard on the project at Longannet, a satisfactory deal for the UK’s first CCS demonstration project could not be met on this particular project at this particular time. The study has yielded invaluable knowledge in areas such as cost, design, end-to-end CCS chain operation, health and safety, environment, consent and permitting, risk management, and lessons learnt.

Conformity

Conformity report

specification

title

INSPIRE Implementing rules laying down technical arrangements for the interoperability and harmonisation of Geology

reference date

date type

publication

effective date

2011

degree

false

explanation

See the referenced specification

Conformity report

specification

title

Commission Regulation (EU) No 1089/2010 of 23 November 2010 implementing Directive 2007/2/EC of the European Parliament and of the Council as regards interoperability of spatial data sets and services

reference date

date type

publication

effective date

2010-12-08

degree

false

explanation

See http://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2010:323:0011:0102:EN:PDF

Data format

name of format

PDF

version of format

Constraints related to access and use

Constraint set

Limitations on public access

Constraint set

Limitations on public access

The copyright of materials derived from the British Geological Survey's work is vested in the Natural Environment Research Council [NERC]. No part of this work may be reproduced or transmitted in any form or by any means, or stored in a retrieval system of any nature, without the prior permission of the copyright holder, via the BGS Intellectual Property Rights Manager. Use by customers of information provided by the BGS, is at the customer's own risk. In view of the disparate sources of information at BGS's disposal, including such material donated to BGS, that BGS accepts in good faith as being accurate, the Natural Environment Research Council (NERC) gives no warranty, expressed or implied, as to the quality or accuracy of the information supplied, or to the information's suitability for any use. NERC/BGS accepts no liability whatever in respect of loss, damage, injury or other occurence however caused.

Responsible organisations

Responsible party

organisation name

Department of Energy & Climate Change (DECC)

email address

not available

responsible party role

owner

Responsible party

organisation name

ScottishPower

email address

not available

responsible party role

originator

Responsible party

organisation name

Scottish CCS Consortium

email address

not available

responsible party role

originator

Responsible party

organisation name

ScottishPower CCS Consortium

email address

not available

responsible party role

principalInvestigator

Responsible party

organisation name

British Geological Survey

full postal address

The Lyell Centre, Research Avenue South

EDINBURGH

EH14 4AP

United Kingdom

telephone number

0115 936 3142

facsimile number

0115 936 3276

email address

enquiries@bgs.ac.uk

responsible party role

distributor

Responsible party

organisation name

British Geological Survey

full postal address

The Lyell Centre, Research Avenue South

EDINBURGH

EH14 4AP

United Kingdom

telephone number

0115 936 3142

facsimile number

0115 936 3276

email address

enquiries@bgs.ac.uk

responsible party role

pointOfContact

Metadata on metadata

Metadata point of contact

organisation name

British Geological Survey

full postal address

The Lyell Centre, Research Avenue South

EDINBURGH

EH14 4AP

United Kingdom

telephone number

+44 131 667 1000

email address

enquiries@bgs.ac.uk

responsible party role

pointOfContact

Metadata date

2022-06-28

Metadata language

eng