Search results

Filter by

Remove filters

14 results found

Species Surveys - Non-Native Species

Invasive non-native species surveyed and collected during the Environment Agency (EA)monitoring activities including location and date of survey. Primarily aquatic and riparian species. Any...

EA Non-native species survey

Invasive non-native species surveyed and collected during the Environment Agency (EA)monitoring activities including location and date of survey. Primarily aquatic and riparian species. Any...

EU Project: Weburn - IEA (International Energy Agency) Weyburn CO2 monitoring and storage project

The IEA (International Energy Agency) Weyburn Carbon Dioxide (CO2) Monitoring and Storage Project has analysed the effects of a miscible CO2 flood into a carbonate reservoir rock at an onshore...

EU Project Report: Weyburn - IEA (International Energy Agency) Weyburn CO2 Monitoring and Storage Project Report, Final report of the European research team

The IEA (International Energy Agency) Weyburn Carbon Dioxide (CO2) Monitoring and Storage Project has analysed the effects of a miscible CO2 flood into a carbonate reservoir rock at an onshore...

UKCCSRC Call 2 Project: Advanced Sorbents for CCS via Controlled Sintering

The project is mainly experimental in nature. Sieved samples of a variety of UK, Canadian and Spanish limestones will be pre-calcined and sintered at elevated temperatures to differing extents...

General Election Results 2010

The results for each candidate standing in all 73 seats in Greater London are available as...

Borough Council Election Results 2010

**London Borough Council Elections - 6 May 2010** ![REPORT](https://s3-eu-west-1.amazonaws.com/londondatastore-upload/boro-elections-2010-cover.png) With the aim of making the democratic process...

2002 Strategic Environmental Assessment SEA3 Technical report - Existing economic activities (North Sea)

This report is a contribution to the Strategic Environmental Assessment (SEA3) conducted by the Department of Trade and Industry (now Department of Energy and Climate Change). The report is a...

Camel Estuary Wreck

This project presents the results of the emergency recording and undesignated site assessment of the possible wreck of the barque Antoinette, Camel Estuary, Padstow, Cornwall carried out by...

Camel Estuary Wreck

This project presents the results of the emergency recording and undesignated site assessment of the possible wreck of the barque Antoinette, Camel Estuary, Padstow, Cornwall carried out by...

Camel Estuary Wreck

This project presents the results of the emergency recording and undesignated site assessment of the possible wreck of the barque Antoinette, Camel Estuary, Padstow, Cornwall carried out by...

Borough Council Election Results 2014

[![](https://londondatastore-upload.s3.amazonaws.com/images/election14cover.JPG)](https://londondatastore-upload.s3.amazonaws.com/London-Borough-Council-Elections-2014.pdf) This report includes a...

Collection of Multi-model Data from the Arctic Predictability and Prediction On Seasonal-to-Interannual Time-scales (APPOSITE) Project

How feasible is it to predict Arctic climate at seasonal-to-interannual timescales? As part of the APPOSITE project a multi-model ensemble prediction experiment was conducted in order to answer...

Collection of Multi-model Data from the Arctic Predictability and Prediction On Seasonal-to-Interannual Time-scales (APPOSITE) Project

How feasible is it to predict Arctic climate at seasonal-to-interannual timescales? As part of the APPOSITE project a multi-model ensemble prediction experiment was conducted in order to answer...